Behnam And Associates
- Based in
- Emeryville
- On San Francisco permits
- Mar 2000 to Nov 2010
- Last 24 months
- 0 permits filed
74 permits since 2000: 33 completed, 10 never finaled, 31 expired or cancelled.
Of the 10 never-finaled permits, 10 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Deck permits
1 deck permit: 1 completed. Typically 0 days from filing to permit and 75 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 18, 2008 | Completed final sign-off Jul 2008 | 3041 Market St | comply with nov 200839870 his. repair rear deck less than 50%, remove illegal kitchen/fixtures. repair floor covering. (final inspection on guest room 9518985). revert building back to 2-units original.Details
comply with nov 200839870 his. repair rear deck less than 50%, remove illegal kitchen/fixtures. repair floor covering. (final inspection on guest room 9518985). revert building back to 2-units original. | $2,500 |