Back to bathroom remodel contractors
Bedrock Construction
- Based in
- San Francisco
- On San Francisco permits
- Apr 2000 to Aug 2026
- Last 24 months
- 6 permits filed
125 permits since 2000: 95 completed, 5 in progress, 11 never finaled, 14 expired or cancelled.
Of the 11 never-finaled permits, 1 is 3 to 5 years old, 4 are 5 to 10 years old, 6 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
19 bathroom remodel permits: 12 completed, 2 in progress, 1 never finaled, 4 expired or cancelled. Typically 7 days from filing to permit and 342 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 5, 2026 | In progress issued Aug 2026 | 584 47th Av | kitchen & bathroom remodel. inkindDetails
kitchen & bathroom remodel. inkind | $20,000 |
| Apr 14, 2025 | In progress issued May 2025 | 377 Fair Oaks St | foundation and slab work, add bathroom and shearwall at bathroom. all work to be performed at basement.Details
foundation and slab work, add bathroom and shearwall at bathroom. all work to be performed at basement. | $70,000 |
| Apr 14, 2025 | Completed final sign-off Jul 2025 | 722 Balboa St | revision to pa# 202202248619: to correct verbage to remove the following statement "(n) small vertival addition for (n) master bathroom at (e) unoccupied roof" as per inspector's instructions. admin only.Details
revision to pa# 202202248619: to correct verbage to remove the following statement "(n) small vertival addition for (n) master bathroom at (e) unoccupied roof" as per inspector's instructions. admin only. | |
| Feb 24, 2022 | Completed final sign-off Jul 2025 | 722 Balboa St | remodel (e) 2-story single family: (n) garage door within (e) ground fl foorprint. (n) driveway & curb cut for (n) ground fl garage. (n) stair (e) ground fl to (e) 1st fl. (n) small vertical addition for (n) master bathroom @ (e) unoccupied roof.Details
remodel (e) 2-story single family: (n) garage door within (e) ground fl foorprint. (n) driveway & curb cut for (n) ground fl garage. (n) stair (e) ground fl to (e) 1st fl. (n) small vertical addition for (n) master bathroom @ (e) unoccupied roof. | $100,000 |
| Sep 4, 2018 | Expired or cancelled expired Jul 2024 | 401 Haight St | commercial - soft story retrofit per sfebc chapter 4d engineering criteria 2016- cebc appendix a-4. accessible entry & accessible bathroom remodel. residential soft story under pa 201809049010Details
commercial - soft story retrofit per sfebc chapter 4d engineering criteria 2016- cebc appendix a-4. accessible entry & accessible bathroom remodel. residential soft story under pa 201809049010 | $32,175 |
| Jun 21, 2018 | Completed final sign-off Jun 2019 | 2735 Mcallister St | remodel existing bathroom and toilet in 2nd fl. unitDetails
remodel existing bathroom and toilet in 2nd fl. unit | $12,000 |
| Aug 10, 2017 | Completed final sign-off Mar 2019 | 452 Haight St | 3/f #1- remodel (e) bath & kitchen, (n) office with new skylights, (n) bedroom #2, relocate entry door, (n) washer/dryer.Details
3/f #1- remodel (e) bath & kitchen, (n) office with new skylights, (n) bedroom #2, relocate entry door, (n) washer/dryer. | $30,000 |
| Mar 22, 2017 | Expired or cancelled expired Jun 2018 | 448 Haight St | enlarge & remodel existing bathroom (half bath to full bath) on ground floor residential unit by combining with adjacent closet.Details
enlarge & remodel existing bathroom (half bath to full bath) on ground floor residential unit by combining with adjacent closet. | $5,000 |
| Nov 21, 2016 | Expired or cancelled expired Jun 2018 | 448 Haight St | replace portion of (e) footing. add ada/accessible compliant bathroom to retail location.Details
replace portion of (e) footing. add ada/accessible compliant bathroom to retail location. | $50,000 |
| May 19, 2016 | Completed final sign-off Apr 2017 | 447 Utah St | bathroom remodel: install new fixtures, cabinets and tiles. remove bathtub and install shower with shower pan.Details
bathroom remodel: install new fixtures, cabinets and tiles. remove bathtub and install shower with shower pan. | $4,500 |
| Aug 4, 2014 | Completed final sign-off Jan 2016 | 449 Utah St | work only at 449 utah st: upper dwelling unit of front building (1) kitchen remodel (2)bath remodel (3) new skylight (4) remove bearing wall and add new posts & beam.Details
work only at 449 utah st: upper dwelling unit of front building (1) kitchen remodel (2)bath remodel (3) new skylight (4) remove bearing wall and add new posts & beam. | $32,000 |
| Jul 8, 2014 | Never finaled issued Jul 2014, no final | 873 Alvarado St | 1)convert unconditioned space at garage into habitable space 2) kitchen remodel. 3)bath remodel at 2nd floor. 4) new bath at 1st floor. 5) new laundry at 1st fl. 6) 3 new wndw at rear yard. 7)replace 1 window and garage door at front facade. 8)install new water heater at 1st flr. 9) new furnace.Details
1)convert unconditioned space at garage into habitable space 2) kitchen remodel. 3)bath remodel at 2nd floor. 4) new bath at 1st floor. 5) new laundry at 1st fl. 6) 3 new wndw at rear yard. 7)replace 1 window and garage door at front facade. 8)install new water heater at 1st flr. 9) new furnace. | $60,000 |
| Aug 2, 2012 | Completed final sign-off Jan 2013 | 144 Arbor St | repair back stairs as to ref nov# 201245441 & nov #2012240221. repair floor in kitchen as needed with like kind. repair drainage pipe at sink in master bathroom iwth like kind less than 50%. replace gfi plug in kithcen.Details
repair back stairs as to ref nov# 201245441 & nov #2012240221. repair floor in kitchen as needed with like kind. repair drainage pipe at sink in master bathroom iwth like kind less than 50%. replace gfi plug in kithcen. | $3,000 |
| Jul 3, 2012 | Completed final sign-off Apr 2013 | 1200 Haight St | work in unit #11: add a full bath, remove and replace e kitchen with newDetails
work in unit #11: add a full bath, remove and replace e kitchen with new | $15,000 |
| Jun 20, 2012 | Completed final sign-off Oct 2012 | 120 Noe St | one bathroom and one kitchen remodel, replace dryrot as needed with like kind, non-structural, no lighting changes to comply with complaint# 201239381Details
one bathroom and one kitchen remodel, replace dryrot as needed with like kind, non-structural, no lighting changes to comply with complaint# 201239381 | $15,000 |
| Jan 17, 2012 | Completed final sign-off Apr 2013 | 1200 Haight St | unit #10-interior renovation-remove & replace (e) kitchen with new, add 1 bathroom. remodel (e) showers in hall.Details
unit #10-interior renovation-remove & replace (e) kitchen with new, add 1 bathroom. remodel (e) showers in hall. | $28,000 |
| Sep 29, 2011 | Completed final sign-off Oct 2012 | 455 Haight St | remodel (1) kitchen, remodel (1) bathroom, new electrical service at main. lighting to comply with cec 150 (k). no change to window, walls, doors.Details
remodel (1) kitchen, remodel (1) bathroom, new electrical service at main. lighting to comply with cec 150 (k). no change to window, walls, doors. | $5,000 |
| Sep 28, 2010 | Completed final sign-off May 2011 | 4143 24th St | remodel bathroom, insulate, sheetrock, tile, replace sink. high efficacy lighting or occupancy, r-13 min wall insulationDetails
remodel bathroom, insulate, sheetrock, tile, replace sink. high efficacy lighting or occupancy, r-13 min wall insulation | $5,000 |
| Jun 21, 2007 | Expired or cancelled expired Feb 2012 | 459 Haight St | bathroom remodel - replace tiles and sink.Details
bathroom remodel - replace tiles and sink. | $3,000 |