Back to bathroom remodel contractors
Bc United Construction Inc
- Based in
- San Francisco
- On San Francisco permits
- Oct 2013 to Sep 2026
- Last 24 months
- 33 permits filed
121 permits since 2000: 89 completed, 21 in progress, 5 never finaled, 6 expired or cancelled.
Of the 5 never-finaled permits, 2 are 3 to 5 years old, 1 is 5 to 10 years old, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
41 bathroom remodel permits: 29 completed, 9 in progress, 2 never finaled, 1 expired or cancelled. Typically 48 days from filing to permit and 341 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 27, 2026 | In progress filed Aug 2026, not yet issued | 676 Broadway | revision 202212168554 and ref 202607205298- convert 2 (e) half bathrooms to full bathrooms by adding showers. remove non load bearing partition between bedroom 5 and (e) stroage room.Details
revision 202212168554 and ref 202607205298- convert 2 (e) half bathrooms to full bathrooms by adding showers. remove non load bearing partition between bedroom 5 and (e) stroage room. | |
| Jul 24, 2026 | In progress issued Aug 2026 | 3119 Pierce St | unit 3119: remodel kitchen and bath; raise existing kitchen window sill height; install new cloth washer and dryer in sunroom; install new direct vent gas fire place.Details
unit 3119: remodel kitchen and bath; raise existing kitchen window sill height; install new cloth washer and dryer in sunroom; install new direct vent gas fire place. | $15,000 |
| Jun 18, 2026 | In progress issued Jun 2026 | 315 Capp St | revision to permit 202604179641. 1/f: demo wall next to the staircase. add wet bar in kitchen. all bathroom relayout. no exterior change.Details
revision to permit 202604179641. 1/f: demo wall next to the staircase. add wet bar in kitchen. all bathroom relayout. no exterior change. | $1,500 |
| Apr 17, 2026 | In progress issued Apr 2026 | 315 Capp St | 1st floor existing kitchen and bathroom remodel. demo wall between kitchen and family room. 2nd floor bathroom relayout, relocate laundry room, convert office to one full bath and walk in closet. replace heater and furnace. no exterior work.Details
1st floor existing kitchen and bathroom remodel. demo wall between kitchen and family room. 2nd floor bathroom relayout, relocate laundry room, convert office to one full bath and walk in closet. replace heater and furnace. no exterior work. | $75,000 |
| Apr 7, 2026 | In progress issued Sep 2026 | 666 03rd Av | rev to pa#s 202504245159 & 202501299330. 1/f: infill windows next to garage. relocate space & water heater equip. 2/f: add direct vent fireplace, open floor plan. 3/f: add new access to attic, reconfigure primary bath, closet, 2nd bath closet, add new attic window, reinforce attic floor for storage.Details
rev to pa#s 202504245159 & 202501299330. 1/f: infill windows next to garage. relocate space & water heater equip. 2/f: add direct vent fireplace, open floor plan. 3/f: add new access to attic, reconfigure primary bath, closet, 2nd bath closet, add new attic window, reinforce attic floor for storage. | $10,000 |
| Oct 9, 2025 | In progress issued Jul 2026 | 3921 18th St | 1st fl convert storage into habitable space to include 2 bedroom, 2 bath and laundry. install a tankless water and furnace in garage. enlarge garage door. 2nd fl: reconfigure interior layout. remove attic at rear.Details
1st fl convert storage into habitable space to include 2 bedroom, 2 bath and laundry. install a tankless water and furnace in garage. enlarge garage door. 2nd fl: reconfigure interior layout. remove attic at rear. | $500,000 |
| Apr 23, 2025 | Completed final sign-off Jul 2025 | 2654 31st Av | revision to pa 202405152194 add new skylight above (e) dining room and bathroom; add a catch basin @ rear yardDetails
revision to pa 202405152194 add new skylight above (e) dining room and bathroom; add a catch basin @ rear yard | |
| Jan 29, 2025 | In progress issued Apr 2025 | 666 03rd Av | voluntary foundation updgrade. kitchen remodel. add full bath to top floor, 2 bathroom remodels. add full bath to ground level.Details
voluntary foundation updgrade. kitchen remodel. add full bath to top floor, 2 bathroom remodels. add full bath to ground level. | $172,000 |
| Oct 31, 2024 | Completed final sign-off Apr 2026 | 1827 33rd Av | renovation and horizontal addition at ground fl. create two bedrooms and baths, family room, laundry and stair connection 2nd fl. two bedrooms and baths, living room, kitchen and dinning remodel front and rear facades new access stair from rear deck to groundDetails
renovation and horizontal addition at ground fl. create two bedrooms and baths, family room, laundry and stair connection 2nd fl. two bedrooms and baths, living room, kitchen and dinning remodel front and rear facades new access stair from rear deck to ground | $730,000 |
| Oct 16, 2024 | Completed final sign-off Oct 2025 | 3890 Market St | interior remodel for symmetrical unit 1, 2, 3,4. remove wall between kitchen and living rm. add laundry room. remodel kitchen and bathroomDetails
interior remodel for symmetrical unit 1, 2, 3,4. remove wall between kitchen and living rm. add laundry room. remodel kitchen and bathroom | $40,000 |
| May 15, 2024 | Completed final sign-off Jul 2025 | 2654 31st Av | alteration to e house. new stair from 2nd fl to rear yard, remodel entire house.increase lvng space gr fl from 317 to 748sf to include 2 bdrms,a bath,storage rm. infill e middle lightwell 2nd fl and rearrange the kitchen layout.Details
alteration to e house. new stair from 2nd fl to rear yard, remodel entire house.increase lvng space gr fl from 317 to 748sf to include 2 bdrms,a bath,storage rm. infill e middle lightwell 2nd fl and rearrange the kitchen layout. | $100,000 |
| May 2, 2024 | In progress issued Jul 2025 | 2972 Bush St | revision to 202309086180, 202403208264 enlarge e attic floor to have the 2 bedrooms and 2 baths. new roof deck at middle of house. infill lightwell (fl 1 and 2 remodel under 202403208264,seismic upgrade 202309086180)Details
revision to 202309086180, 202403208264 enlarge e attic floor to have the 2 bedrooms and 2 baths. new roof deck at middle of house. infill lightwell (fl 1 and 2 remodel under 202403208264,seismic upgrade 202309086180) | $100,000 |
| Feb 16, 2024 | Completed final sign-off Sep 2025 | 54 Carmelita St | comply w/ nov #202303636; fire repair and altertion repair fire damage to the north exterior wall, enlarge (e) opening between kitchen and dining room on 1st & 2nd fl. install a new skylight above (e) stairway remodel (e) bathrooms in kind at 1st & 2nd fl. install new radiant heating system.Details
comply w/ nov #202303636; fire repair and altertion repair fire damage to the north exterior wall, enlarge (e) opening between kitchen and dining room on 1st & 2nd fl. install a new skylight above (e) stairway remodel (e) bathrooms in kind at 1st & 2nd fl. install new radiant heating system. | $20,000 |
| Dec 16, 2022 | In progress issued Oct 2024 | 674 Broadway | rev to 2021-0716-4549: t.i. at 2nd fl office space. change commercial to residential: additon of a 5 bedrooms, 6 bathrooms (4 full baths, 2 half baths), new kitchen & living room & dining room; add skylight to bedrooms, expand (e) lightwell. (original work started under 2016-0203-8720)Details
rev to 2021-0716-4549: t.i. at 2nd fl office space. change commercial to residential: additon of a 5 bedrooms, 6 bathrooms (4 full baths, 2 half baths), new kitchen & living room & dining room; add skylight to bedrooms, expand (e) lightwell. (original work started under 2016-0203-8720) | $40,000 |
| Nov 17, 2022 | Completed final sign-off Oct 2023 | 142 Talbert St | g/f: re-arrange floor layout in (e) family room to (2) bedrooms, two bathrooms & a family room.Details
g/f: re-arrange floor layout in (e) family room to (2) bedrooms, two bathrooms & a family room. | $40,000 |
| Mar 30, 2022 | Completed final sign-off May 2022 | 1345 Noe St | revision to pa# 202003167136. basement: reconfigure bathroom & laundry layout. 1st fl: add storage closet, relocate laundry room. 2nd fl: replace nana wall to window in family room.Details
revision to pa# 202003167136. basement: reconfigure bathroom & laundry layout. 1st fl: add storage closet, relocate laundry room. 2nd fl: replace nana wall to window in family room. | $2,000 |
| Dec 22, 2021 | Completed final sign-off Mar 2024 | 1966 Green St | renovate & infill lightwell on west side, bsmt-2/f(common area) add gym & storage. create platform @ east side. remodel @ units 1968 (1f) & 1966 (2f) to kitchens, baths, offices, bedrms, add bedmrs & baths. (n) int. stairs from b-1f & 2f-attic. attic(1966): add 2 bedrm, 2 bath, 1 ent. rm, roof deckDetails
renovate & infill lightwell on west side, bsmt-2/f(common area) add gym & storage. create platform @ east side. remodel @ units 1968 (1f) & 1966 (2f) to kitchens, baths, offices, bedrms, add bedmrs & baths. (n) int. stairs from b-1f & 2f-attic. attic(1966): add 2 bedrm, 2 bath, 1 ent. rm, roof deck | $100,000 |
| Oct 26, 2021 | Completed final sign-off Oct 2022 | 1826 23rd Av | 1/f: add a bedroom, a abthroom, an office, wet bar & an entertainment/louge. 2/f: infill light wells at north & south side of bldg. reconfigure interior layout with two bedrooms, two bathrooms, one powder room, kitchen, dining, breakfast & living room. add deck at rear of bldg, add four skylights.Details
1/f: add a bedroom, a abthroom, an office, wet bar & an entertainment/louge. 2/f: infill light wells at north & south side of bldg. reconfigure interior layout with two bedrooms, two bathrooms, one powder room, kitchen, dining, breakfast & living room. add deck at rear of bldg, add four skylights. | $30,000 |
| Jul 13, 2021 | Completed final sign-off Jul 2022 | 60 Carmelita St | 3rd fl: convert e living rm into mstr bdrm with 4 fix bath and wic. remove wall at rear of unit to create open kitchen/lr, kitchen remode. add skylight abv stairwell.new laundry unit. new ele wall heat system for all habitable space. new domestic tankless whtr at rear of bldg.wndw replacement rear.Details
3rd fl: convert e living rm into mstr bdrm with 4 fix bath and wic. remove wall at rear of unit to create open kitchen/lr, kitchen remode. add skylight abv stairwell.new laundry unit. new ele wall heat system for all habitable space. new domestic tankless whtr at rear of bldg.wndw replacement rear. | $50,000 |
| Mar 29, 2021 | Completed final sign-off Oct 2021 | 739 Clayton St | remodel (e) kitchen & bathroom/powder room @ both units. no strucural work. no framing work (new)Details
remodel (e) kitchen & bathroom/powder room @ both units. no strucural work. no framing work (new) | $40,000 |
| Mar 29, 2021 | Completed final sign-off Apr 2025 | 724 Head St | horizontal addtion include 1st floor: relocate the staircase to 2nd floor; add media room, bedroom, office, play room and three 3-fixture bathroom; 2nd floor remodel the existng kicthen and two bedrooms,bathroom; add one bedroom, powder room and one 3-fixture bathroom.Details
horizontal addtion include 1st floor: relocate the staircase to 2nd floor; add media room, bedroom, office, play room and three 3-fixture bathroom; 2nd floor remodel the existng kicthen and two bedrooms,bathroom; add one bedroom, powder room and one 3-fixture bathroom. | $150,000 |
| Oct 27, 2020 | Completed final sign-off Jan 2022 | 785 Oak St | basement: replace window at (e) bedroom. french door replacement at (e) bedroom. add door at (e) office. eliminate partial deck and stair at rear yard. add 6' privacy wood screen at (e) decking. 1st flr: remove closets t living room. relocate kitchen & dining room. elminate lenient closet @ bathroomDetails
basement: replace window at (e) bedroom. french door replacement at (e) bedroom. add door at (e) office. eliminate partial deck and stair at rear yard. add 6' privacy wood screen at (e) decking. 1st flr: remove closets t living room. relocate kitchen & dining room. elminate lenient closet @ bathroom | $50,000 |
| Mar 16, 2020 | Completed final sign-off May 2022 | 1345 Noe St | basement, convert crawl space to conditional space. reconfigure interior layout w/ 2 bedrooms, 2 3-fixture bathrooms, entertainment & laundry room. relocate water heater to garage on 1st floor. 2nd floor: reconfigure (e) kitchen. replace doors with nana walls.Details
basement, convert crawl space to conditional space. reconfigure interior layout w/ 2 bedrooms, 2 3-fixture bathrooms, entertainment & laundry room. relocate water heater to garage on 1st floor. 2nd floor: reconfigure (e) kitchen. replace doors with nana walls. | $235,000 |
| Jul 9, 2019 | Completed final sign-off May 2022 | 1345 Noe St | interior renovation, basement - convert (e) storage into bedroom, retreat & bath. add interior staircase to 1st fl; 1st fl - convert (e) storage to bedroom, media, family & bath. reconfigure interior staircase to 2nd fl; 2nd fl - remove (e) stair case to back yard; 3rd fl - add 1 bath; reconfigureDetails
interior renovation, basement - convert (e) storage into bedroom, retreat & bath. add interior staircase to 1st fl; 1st fl - convert (e) storage to bedroom, media, family & bath. reconfigure interior staircase to 2nd fl; 2nd fl - remove (e) stair case to back yard; 3rd fl - add 1 bath; reconfigure | $150,000 |
| Jul 1, 2019 | Completed final sign-off May 2021 | 3643 20th St | revision to app#201803163818 including revision to main floor bathroom and closet layout and addition of construction details.Details
revision to app#201803163818 including revision to main floor bathroom and closet layout and addition of construction details. | |
| Mar 1, 2019 | Completed final sign-off May 2021 | 3643 20th St | addition of living space to extg 9'-3" tall basement within bldg envelope. addition shall include new bedroom, 2 bathrooms, entertainment room and den. new stairs from main floor to basement.Details
addition of living space to extg 9'-3" tall basement within bldg envelope. addition shall include new bedroom, 2 bathrooms, entertainment room and den. new stairs from main floor to basement. | $45,000 |
| Aug 18, 2017 | Completed final sign-off Jun 2019 | 4376 17th St | comply w/ nov 201761911, clerification of scope of work. revision to 201611293702, 201608296201 expand g/f, excav rear at garage & legalize attic to bedrms & baths, new dormer, skylight,lower 3rd flr, 2nd flr balcony. repair front ext stairs. rebuilt 3rd flr.Details
comply w/ nov 201761911, clerification of scope of work. revision to 201611293702, 201608296201 expand g/f, excav rear at garage & legalize attic to bedrms & baths, new dormer, skylight,lower 3rd flr, 2nd flr balcony. repair front ext stairs. rebuilt 3rd flr. | $300,000 |
| Jul 24, 2017 | Completed final sign-off Aug 2018 | 314 Sanchez St | excavate under 50 cu to creat patio at rear 1st fl,add 2 bdrm,1 full bath, 1 media rm 1st fl, add int staircase to create connectin between 1/2 flper plan,eliminate lightwell no side bldg,2nd 3rd fl,infill partial lightwell so side 2nd/3rd fl,reconfigure int layout,add 1 full bath both 2nd,3rd fl,Details
excavate under 50 cu to creat patio at rear 1st fl,add 2 bdrm,1 full bath, 1 media rm 1st fl, add int staircase to create connectin between 1/2 flper plan,eliminate lightwell no side bldg,2nd 3rd fl,infill partial lightwell so side 2nd/3rd fl,reconfigure int layout,add 1 full bath both 2nd,3rd fl, | $100,000 |
| Nov 29, 2016 | Expired or cancelled revoked Sep 2017 | 4376 17th St | interior remodel of 2nd and 3rd fl, partial removal of existing wall and relocation of walls. build new parition wall. remodel kitchen and baths. gr fl on prev permit 201608296201Details
interior remodel of 2nd and 3rd fl, partial removal of existing wall and relocation of walls. build new parition wall. remodel kitchen and baths. gr fl on prev permit 201608296201 | $50,000 |
| Aug 29, 2016 | Completed final sign-off Jun 2019 | 4376 17th St | revision to pa 2016-0715-2452 - remodel of ground floor. full foundation repair/replace with new footing; repair of studwall at ground floor & perform voluntary seismic upgrade at groundfloor. add bedroom, family room, study & bathroomDetails
revision to pa 2016-0715-2452 - remodel of ground floor. full foundation repair/replace with new footing; repair of studwall at ground floor & perform voluntary seismic upgrade at groundfloor. add bedroom, family room, study & bathroom | $15,000 |
| Jan 15, 2016 | Completed final sign-off Sep 2016 | 155 Somerset St | replace kitchen cabinets, convert extg breakfast nook into small bedroom. remodel master bedroom, add one new bathroom. upgrade extg electrical switches and outlets throughout.Details
replace kitchen cabinets, convert extg breakfast nook into small bedroom. remodel master bedroom, add one new bathroom. upgrade extg electrical switches and outlets throughout. | $10,000 |
| Oct 2, 2015 | Completed final sign-off Jul 2016 | 1318 Taylor St | interior remodeling only. remodel extg kitchen and bathroom. remove extg power room and build new full bathroom.Details
interior remodeling only. remodel extg kitchen and bathroom. remove extg power room and build new full bathroom. | $25,000 |
| May 21, 2015 | Completed final sign-off Jul 2016 | 1314 Taylor St | construct new full bathroom. enlarge and remodel extg kitchen. reduce extg bathroom into powder room. upgrade extg electrical, switches, outlets, etc. throughout.Details
construct new full bathroom. enlarge and remodel extg kitchen. reduce extg bathroom into powder room. upgrade extg electrical, switches, outlets, etc. throughout. | $48,000 |
| Feb 17, 2015 | Completed final sign-off Jun 2015 | 259 Tocoloma Av | add a new bathroom and relocate closets on 2/fDetails
add a new bathroom and relocate closets on 2/f | $5,000 |
| Feb 5, 2015 | Completed final sign-off Jun 2015 | 259 Tocoloma Av | remodel (e) kitchen and bathroom in kindDetails
remodel (e) kitchen and bathroom in kind | $4,000 |
| Dec 12, 2014 | Completed final sign-off Apr 2016 | 554 44th Av | revision to 201409156290 - relocate bath @ 1st fl, change full bath to half bath @ 2nd fl. reconfigure bath layout & (n) rear roof deck on 3rd fl. replace windows to alum clad windows, add (n) dormers & skylights @ bldg front.Details
revision to 201409156290 - relocate bath @ 1st fl, change full bath to half bath @ 2nd fl. reconfigure bath layout & (n) rear roof deck on 3rd fl. replace windows to alum clad windows, add (n) dormers & skylights @ bldg front. | $10,000 |
| Sep 15, 2014 | Completed final sign-off Apr 2016 | 554 44th Av | infill lightwell on the side & rear of bldg. convert extg attic into 3rd flr for nw den or playroom. add 2 new bedrms, bath & family room on 1st floor. add new master bath on 2nd floor. add new bath on 3rd floor. add new interior stair connecting 3 flr.Details
infill lightwell on the side & rear of bldg. convert extg attic into 3rd flr for nw den or playroom. add 2 new bedrms, bath & family room on 1st floor. add new master bath on 2nd floor. add new bath on 3rd floor. add new interior stair connecting 3 flr. | $100,000 |
| Aug 21, 2014 | Completed final sign-off Apr 2016 | 554 44th Av | remodel extg kitchen and extg bathroom. no structural work; to comply with cec150.0(k)3 & 5Details
remodel extg kitchen and extg bathroom. no structural work; to comply with cec150.0(k)3 & 5 | $20,000 |
| May 1, 2014 | Completed final sign-off Jun 2017 | 114 St Marys Av | 1st floor: add 1-1/2 bathroom, convert kitchen to a wet bar. 2nd floor: add 1-1/2 bathroom, convert one bedroom to living room. add 2 dormers at attic floor.Details
1st floor: add 1-1/2 bathroom, convert kitchen to a wet bar. 2nd floor: add 1-1/2 bathroom, convert one bedroom to living room. add 2 dormers at attic floor. | $70,000 |
| Apr 16, 2014 | Never finaled issued Jun 2014, no final | 501 Crescent Av | 1st floor: total remodel, add 2 baths, 1 bedrooms,1 media room, den, office and one media room. 2nd floor:remodel kitchen and 1.5 baths. resheetrock entire dwelling, voluntary seismic whole dwellingDetails
1st floor: total remodel, add 2 baths, 1 bedrooms,1 media room, den, office and one media room. 2nd floor:remodel kitchen and 1.5 baths. resheetrock entire dwelling, voluntary seismic whole dwelling | $100,000 |
| Oct 21, 2013 | Never finaled issued Feb 2016, no final | 22 Ord Ct | horizontal additon to front bldg. proposed horizontal additon to an existing single family home. there is new storage at 1/fl, new living room, dining room, 3 new bedrooms & 2 bathrooms added.Details
horizontal additon to front bldg. proposed horizontal additon to an existing single family home. there is new storage at 1/fl, new living room, dining room, 3 new bedrooms & 2 bathrooms added. | $250,000 |