Back to bathroom remodel contractors
Baywolf Construction Inc
- Based in
- San Francisco
- On San Francisco permits
- Dec 2001 to Dec 2008
- Last 24 months
- 0 permits filed
74 permits since 2000: 42 completed, 9 never finaled, 23 expired or cancelled.
Of the 9 never-finaled permits, 9 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
12 bathroom remodel permits: 9 completed, 3 expired or cancelled. Typically 0 days from filing to permit and 297 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 20, 2008 | Completed final sign-off Oct 2008 | 2847 Baker St | interior remodel including kitchen, bathroom and master bathroom. replacement of 2 windows. new lighting and wiring throughout. new posts and beam at 3rd level.Details
interior remodel including kitchen, bathroom and master bathroom. replacement of 2 windows. new lighting and wiring throughout. new posts and beam at 3rd level. | $175,000 |
| Jun 1, 2007 | Expired or cancelled expired Mar 2009 | 1236 De Haro St | bathroom demolition and remodel all interior. relocate toilet and bathtub and add shower. replace floors of exercise room, sheetrock existing closet. removal of storage shed on beck deck, move existing window slightly, add new furnaceDetails
bathroom demolition and remodel all interior. relocate toilet and bathtub and add shower. replace floors of exercise room, sheetrock existing closet. removal of storage shed on beck deck, move existing window slightly, add new furnace | $50,000 |
| Jan 3, 2007 | Completed final sign-off Apr 2007 | 713 Noe St | bathroom remodel new fixtures at finishes. no new floor area or moved wallsDetails
bathroom remodel new fixtures at finishes. no new floor area or moved walls | $30,000 |
| Dec 29, 2005 | Completed final sign-off Dec 2006 | 83 Divisadero St | remodel extg bedroom and bathroom on 3rd floor,kitchen replace extg window with new smaller wndw/add 6 new skylight and 1/2 bath/add new wall between nursery and bedroom at 2nd floorDetails
remodel extg bedroom and bathroom on 3rd floor,kitchen replace extg window with new smaller wndw/add 6 new skylight and 1/2 bath/add new wall between nursery and bedroom at 2nd floor | $125,000 |
| Dec 15, 2005 | Completed final sign-off Apr 2007 | 822 Douglass St | rev.to appl#200411189641 per approved site permit,put bathroom back into garage level,lower slab,minor structural revision,remove exterior door @garage level,reduce window size at master bedroom,new fireplace @living room.Details
rev.to appl#200411189641 per approved site permit,put bathroom back into garage level,lower slab,minor structural revision,remove exterior door @garage level,reduce window size at master bedroom,new fireplace @living room. | $12,500 |
| Nov 1, 2005 | Expired or cancelled expired Mar 2009 | 920 Diamond St | new 2 stosry rear addition, rebuild in kind of front entry stairway, remodel of 2 interior doorways, new sink @ 2nd floor bath.Details
new 2 stosry rear addition, rebuild in kind of front entry stairway, remodel of 2 interior doorways, new sink @ 2nd floor bath. | $150,000 |
| Oct 28, 2005 | Completed final sign-off Dec 2006 | 83 Divisadero St | remodeling e bathroom at 2nd floor, partition wallsDetails
remodeling e bathroom at 2nd floor, partition walls | $10,000 |
| Apr 8, 2005 | Completed final sign-off Jan 2006 | 387 Wawona St | bathroom remodel- move fixture locations, reconstruct (e) front stair due to water damageDetails
bathroom remodel- move fixture locations, reconstruct (e) front stair due to water damage | $50,000 |
| Mar 4, 2005 | Completed final sign-off Aug 2005 | 3476 Jackson St | remodel (e) bathroom & laundry room on lower level per plan.Details
remodel (e) bathroom & laundry room on lower level per plan. | $30,000 |
| Jun 3, 2004 | Completed final sign-off Apr 2006 | 1541 Alabama St | demolish extg deck/build new ground floor rm & bath with new deck above/bld nw internal strs to rmDetails
demolish extg deck/build new ground floor rm & bath with new deck above/bld nw internal strs to rm | $40,000 |
| Apr 22, 2003 | Completed final sign-off May 2004 | 1000 Chenery St | add bathroom to lower level, lower floor to (e) lower level bedroomDetails
add bathroom to lower level, lower floor to (e) lower level bedroom | $40,000 |
| May 24, 2002 | Expired or cancelled expired Feb 2004 | 763 De Haro St | repair/rebuild foundation, renovate upper level bathroom, renovate lower level & basement level, addDetails
repair/rebuild foundation, renovate upper level bathroom, renovate lower level & basement level, add | $300,000 |