Bayside Construction

Contractor license
442447
State license record
Based in
San Francisco
On San Francisco permits
Jan 2000 to Jun 2012
Last 24 months
0 permits filed

14 permits since 2000: 10 completed, 2 never finaled, 2 expired or cancelled.

Of the 2 never-finaled permits, 2 are over 10 years old.

CompletedIn progressNever finaledExpired or cancelled

This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records

Permits filed each year

How long permits take

Median days to final inspection, citywideMedian days to permit issued, citywide

Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.

Bathroom remodel permits

AllStairs 3Kitchen remodel 2Bathroom remodel 3

3 bathroom remodel permits: 2 completed, 1 never finaled. Typically 0 days from filing to permit and 71 days from permit to final inspection.

FiledOutcomeAddressWork described on the permitDeclared cost
Jun 19, 2012Completed
final sign-off Sep 2012
455 Scott Stone bath remodel - replace stall shower in kind, replace toilet, sink, light fixtures.
Details
Permit
201206192875
Status
complete
Filed
Jun 19, 2012
Permit issued
Jun 19, 2012
Final sign-off
Sep 17, 2012
Declared cost
$15,000
Address
455 Scott St

one bath remodel - replace stall shower in kind, replace toilet, sink, light fixtures.

Open the permit page

$15,000
Sep 17, 2007Completed
final sign-off Nov 2007
742 Dolores Stremove existing clawfoot tub, creat e 3x5 stall, shower stall in its place, no new lightting, existing toilet,sink to remain in bath
Details
Permit
200709172872
Status
complete
Filed
Sep 17, 2007
Permit issued
Sep 17, 2007
Final sign-off
Nov 8, 2007
Declared cost
$9,000
Address
742 Dolores St

remove existing clawfoot tub, creat e 3x5 stall, shower stall in its place, no new lightting, existing toilet,sink to remain in bath

Open the permit page

$9,000
Aug 30, 2007Never finaled
issued Aug 2007, no final
742 Dolores Stremodel upstairs hall bathroom & adjoining water closet:relocate bath lavatory, leave (e) bathroom toilet & tub, convert wc into stall shower, fill in wc window with glass block, fill wc hallway doorway, create shower opening thru bathroom. wc floor space =16.25sq.ft.
Details
Permit
200708301289
Status
issued
Filed
Aug 30, 2007
Permit issued
Aug 30, 2007
Declared cost
$18,000
Address
742 Dolores St

remodel upstairs hall bathroom & adjoining water closet:relocate bath lavatory, leave (e) bathroom toilet & tub, convert wc into stall shower, fill in wc window with glass block, fill wc hallway doorway, create shower opening thru bathroom. wc floor space =16.25sq.ft.

Open the permit page

$18,000