Bay Pros Construction
- Based in
- San Francisco
- On San Francisco permits
- Nov 2013 to Mar 2019
- Last 24 months
- 0 permits filed
13 permits since 2000: 13 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Deck permits
2 deck permits: 2 completed. Typically 13 days from filing to permit and 111 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Dec 22, 2015 | Completed final sign-off Feb 2016 | 161 Devonshire Wy | install sister joist next to damge joist 2 total 10 feet run into the house 6 feet run outside (deck area). repair exterior siding (front of house) approx. 50 sq. ft.Details
install sister joist next to damge joist 2 total 10 feet run into the house 6 feet run outside (deck area). repair exterior siding (front of house) approx. 50 sq. ft. | $4,000 |
| Oct 8, 2014 | Completed final sign-off Apr 2015 | 496 Utah St | new exterior wood deck in rear yard, new retaining wall at back of property, new fence less than 10 ft highDetails
new exterior wood deck in rear yard, new retaining wall at back of property, new fence less than 10 ft high | $25,000 |