Back to bathroom remodel contractors
Bay Counties Construction & Maint.
- Based in
- Daly City
- On San Francisco permits
- Oct 2002 to Sep 2025
- Last 24 months
- 1 permit filed
67 permits since 2000: 51 completed, 11 never finaled, 5 expired or cancelled.
Of the 11 never-finaled permits, 7 are 5 to 10 years old, 4 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
15 bathroom remodel permits: 11 completed, 3 never finaled, 1 expired or cancelled. Typically 0 days from filing to permit and 262 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jan 25, 2019 | Completed final sign-off Nov 2019 | 630 Mason St | kitchen & bath remodel, replace in -kindDetails
kitchen & bath remodel, replace in -kind | $50,000 |
| Feb 22, 2018 | Never finaled issued Feb 2018, no final | 350 Spruce St | kitchen and bathroom remodel. replace in kind. no alteration of wall, window and door.Details
kitchen and bathroom remodel. replace in kind. no alteration of wall, window and door. | $50,000 |
| Nov 30, 2017 | Completed final sign-off Apr 2018 | 15 Athens St | bathroom remodel, replace fixtures in kindDetails
bathroom remodel, replace fixtures in kind | $14,000 |
| Aug 22, 2017 | Completed final sign-off Oct 2017 | 3625 16th St | upper unit -remodel bathroom. n/a for maher.Details
upper unit -remodel bathroom. n/a for maher. | $20,000 |
| Mar 2, 2017 | Expired or cancelled cancelled Feb 2022 | 630 Mason St | unit 1201 - add half bath in existing closet areaDetails
unit 1201 - add half bath in existing closet area | $15,000 |
| Sep 9, 2016 | Never finaled issued Sep 2016, no final | 246 Corbett Av | bathroom remodel. no structural work. no wall modification.Details
bathroom remodel. no structural work. no wall modification. | $12,000 |
| Aug 17, 2016 | Completed final sign-off May 2017 | 630 Mason St | unit 303: bathroom fixture relocattion. close off dining room from kitchen with new wall construction in (e) opening. remodel kitchen.Details
unit 303: bathroom fixture relocattion. close off dining room from kitchen with new wall construction in (e) opening. remodel kitchen. | $15,000 |
| Jun 16, 2016 | Never finaled issued Jun 2016, no final | 4354 18th St | remodel kitchen and bathroom in-kind. no change to walls, doors, openings or layout.Details
remodel kitchen and bathroom in-kind. no change to walls, doors, openings or layout. | $2,000 |
| Jun 29, 2009 | Completed final sign-off Apr 2010 | 161 Crescent Av | interior remodel. remodel (e) kitchen, (e) bathrm, construct new half bath at 1st fl, new full bath at 2nd floor, new closet at 2nd fl bedrm, rough in for laundry and w/d at (e) porchDetails
interior remodel. remodel (e) kitchen, (e) bathrm, construct new half bath at 1st fl, new full bath at 2nd floor, new closet at 2nd fl bedrm, rough in for laundry and w/d at (e) porch | $60,000 |
| Apr 23, 2009 | Completed final sign-off Aug 2009 | 2953 21st St | old shower, vanity & tub to be removed. new shower & sink to be replaced plus flooring. toilet stays. gfi box to be moved from 48" down to 12". bathroom to remain same size & location. no new walls. no modification to existing walls.Details
old shower, vanity & tub to be removed. new shower & sink to be replaced plus flooring. toilet stays. gfi box to be moved from 48" down to 12". bathroom to remain same size & location. no new walls. no modification to existing walls. | $9,100 |
| Oct 20, 2006 | Completed final sign-off Jul 2007 | 630 Mason St | wok @ unit# 103 only. 1 kitchen remodel. re-frame (e) 150 sq. ft. wall-metal framing. replace cabinets, plumbing fixtures in like kind. 1 bath remodel. replace fixtures in like kind. install plumbing for washer / dryer. update electrical. kitchen, bath. move panel from closet to hall.Details
wok @ unit# 103 only. 1 kitchen remodel. re-frame (e) 150 sq. ft. wall-metal framing. replace cabinets, plumbing fixtures in like kind. 1 bath remodel. replace fixtures in like kind. install plumbing for washer / dryer. update electrical. kitchen, bath. move panel from closet to hall. | $50,000 |
| Feb 13, 2006 | Completed final sign-off Nov 2006 | 3357 Folsom St | remodel bathroom: replace sheetrock, tile-floor & walls, replace plumbing & electrical fixtures in like kind.Details
remodel bathroom: replace sheetrock, tile-floor & walls, replace plumbing & electrical fixtures in like kind. | $15,000 |
| Feb 13, 2006 | Completed final sign-off Nov 2006 | 3357 Folsom St | remodel bathroom:replace tub,plumbing fixtures,light fixtures in like kind. revision to appl#200601202722 correction of address - correct is unit #2Details
remodel bathroom:replace tub,plumbing fixtures,light fixtures in like kind. revision to appl#200601202722 correction of address - correct is unit #2 | |
| Jan 20, 2006 | Completed final sign-off Nov 2006 | 3357 Folsom St | bathroom remodel & replace tub, plumbing fixtrues light fixtures & water closet. no new lighting unit#3 @1st floorDetails
bathroom remodel & replace tub, plumbing fixtrues light fixtures & water closet. no new lighting unit#3 @1st floor | $10,000 |
| Jan 20, 2006 | Completed final sign-off Mar 2006 | 630 Mason St | bathroom remodel : replace plumbing fixtures. light fixtures cabinet + tile @ 6th fl unit #607 no new lighting.Details
bathroom remodel : replace plumbing fixtures. light fixtures cabinet + tile @ 6th fl unit #607 no new lighting. | $18,500 |