Back to bathroom remodel contractors
Bay City Construction
- Based in
- San Francisco
- On San Francisco permits
- Aug 2009 to Sep 2010
- Last 24 months
- 0 permits filed
3 permits since 2000: 2 completed, 1 never finaled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
1 bathroom remodel permit: 1 completed. Typically 0 days from filing to permit and 33 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 23, 2010 | Completed final sign-off Jul 2010 | 23 Palm Av | change new fixtures in the bathroom including bath tub, toilet, medicine cabinet and a sink, set new floor and wal tiles around bath tub, provide high efficacy lights per cec 151 (k)Details
change new fixtures in the bathroom including bath tub, toilet, medicine cabinet and a sink, set new floor and wal tiles around bath tub, provide high efficacy lights per cec 151 (k) | $12,677 |