Bay Alarm Company
- Based in
- Concord
- On San Francisco permits
- Sep 2006 to Sep 2020
- Last 24 months
- 0 permits filed
543 permits since 2000: 408 completed, 102 never finaled, 33 expired or cancelled.
Of the 102 never-finaled permits, 36 are 5 to 10 years old, 66 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
1 bathroom remodel permit: 1 completed. Typically 0 days from filing to permit and 98 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 23, 2011 | Completed final sign-off Sep 2011 | 401 Duboce Av | emergency replacement due to failure (e) ms9200 facu to be replaced with new ms900 udls. all (e) field devices are listed-compatible with bath the fixtures facu & new facu per sffd ab-3.04.1 100% testing of the fa system functions & 10% testing of (e) devices are required to be performed per the apDetails
emergency replacement due to failure (e) ms9200 facu to be replaced with new ms900 udls. all (e) field devices are listed-compatible with bath the fixtures facu & new facu per sffd ab-3.04.1 100% testing of the fa system functions & 10% testing of (e) devices are required to be performed per the ap | $2,071 |