Permit GraphShortlistSan Francisco building permits since 2000

Bay Alarm Company

Contractor license
903821
State license record
Based in
Concord
On San Francisco permits
Sep 2006 to Sep 2020
Last 24 months
0 permits filed

543 permits since 2000: 408 completed, 102 never finaled, 33 expired or cancelled.

Of the 102 never-finaled permits, 36 are 5 to 10 years old, 66 are over 10 years old.

CompletedIn progressNever finaledExpired or cancelled

This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records

Permits filed each year

How long permits take

Median days to final inspection, citywideMedian days to permit issued, citywide

Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.

Bathroom remodel permits

AllKitchen remodel 3Bathroom remodel 1

1 bathroom remodel permit: 1 completed. Typically 0 days from filing to permit and 98 days from permit to final inspection.

FiledOutcomeAddressWork described on the permitDeclared cost
Jun 23, 2011Completed
final sign-off Sep 2011
401 Duboce Avemergency replacement due to failure (e) ms9200 facu to be replaced with new ms900 udls. all (e) field devices are listed-compatible with bath the fixtures facu & new facu per sffd ab-3.04.1 100% testing of the fa system functions & 10% testing of (e) devices are required to be performed per the ap
Details
Permit
201106238788
Status
complete
Filed
Jun 23, 2011
Permit issued
Jun 23, 2011
Final sign-off
Sep 29, 2011
Declared cost
$2,071
Address
401 Duboce Av

emergency replacement due to failure (e) ms9200 facu to be replaced with new ms900 udls. all (e) field devices are listed-compatible with bath the fixtures facu & new facu per sffd ab-3.04.1 100% testing of the fa system functions & 10% testing of (e) devices are required to be performed per the ap

Open the permit page

$2,071