Permit GraphShortlistSan Francisco building permits since 2000

Bauhaus Construction

Contractor license
616822
State license record
Based in
Sebastopol
On San Francisco permits
Apr 2019 to Apr 2019
Last 24 months
0 permits filed

1 permit since 2000: 1 completed.

CompletedIn progressNever finaledExpired or cancelled

This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records

Permits filed each year

How long permits take

Median days to final inspection, citywideMedian days to permit issued, citywide

Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.

Most recent permits

AllKitchen remodel 1Bathroom remodel 1
FiledOutcomeAddressWork described on the permitDeclared cost
Apr 22, 2019Completed
final sign-off Apr 2024
1083 Clay Stunit 203 - no change to wall layout. remodel (e) kitchen: replace all cabinets and appliances in same layout; remodel (e) bathroom with fixtures in same locations; replace (e) tub with new walk in shower; replace all recessed light fixtures throughout & add ne recessed light fixtures at bedroom &
Details
Permit
201904228636
Status
complete
Filed
Apr 22, 2019
Permit issued
Apr 23, 2019
Final sign-off
Apr 26, 2024
Declared cost
$42,750
Address
1083 Clay St

unit 203 - no change to wall layout. remodel (e) kitchen: replace all cabinets and appliances in same layout; remodel (e) bathroom with fixtures in same locations; replace (e) tub with new walk in shower; replace all recessed light fixtures throughout & add ne recessed light fixtures at bedroom &

Open the permit page

$42,750