Battalion One Fire Protection
- Based in
- San Leandro
- On San Francisco permits
- Oct 2009 to Jun 2026
- Last 24 months
- 43 permits filed
415 permits since 2000: 284 completed, 37 in progress, 82 never finaled, 12 expired or cancelled.
Of the 82 never-finaled permits, 23 are 3 to 5 years old, 44 are 5 to 10 years old, 15 are over 10 years old. 4 were filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Deck permits
1 deck permit: 1 completed. Typically 54 days from filing to permit and 10 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Dec 3, 2020 | Completed final sign-off Feb 2021 | 3251 20th Av | add, relocate, and demolish sprinklers as required to accommodate the addition of new floor to deck demising walls as part of ti. (note: future, separate permits to cover tenant buildouts.) existing sprinkler piping to remain. g.c. building permit ref: 2020-0721-0601Details
add, relocate, and demolish sprinklers as required to accommodate the addition of new floor to deck demising walls as part of ti. (note: future, separate permits to cover tenant buildouts.) existing sprinkler piping to remain. g.c. building permit ref: 2020-0721-0601 | $6,500 |