Baths For Less Llc Dba Jacuzzi Bath Remo
- Based in
- Chino
- On San Francisco permits
- May 2026 to Nov 2026
- Last 24 months
- 35 permits filed
35 permits since 2000: 34 in progress, 1 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Where they worked
- Single-family 27
- Multi-family (2-family, apartments) 8
- Commercial 0
- Other or unknown 0
One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Nov 9, 2026 | In progress issued Nov 2026 | 111 12th Av | 2nd floor: bathroom scope of work: remove existing tub/shower, replace with new 60"x30" shower. existing plumbing and drain to remain.Details
2nd floor: bathroom scope of work: remove existing tub/shower, replace with new 60"x30" shower. existing plumbing and drain to remain. | $10,000 |
| Nov 3, 2026 | In progress issued Nov 2026 | 2425 22nd Av | remove existing tub/shower combo replace with 60"x30" walk in shower in same location. drain location to remain. no changes to remaining toilet, lavatory, no structural, exterior, electrical or mech work proposed.Details
remove existing tub/shower combo replace with 60"x30" walk in shower in same location. drain location to remain. no changes to remaining toilet, lavatory, no structural, exterior, electrical or mech work proposed. | $11,000 |
| Oct 30, 2026 | In progress issued Nov 2026 | 2929 Lincoln Wy | tub to 60"x30" walk-in shower conversion in existing full bath. drain location to remain. no changes to layout.Details
tub to 60"x30" walk-in shower conversion in existing full bath. drain location to remain. no changes to layout. | $10,240 |
| Oct 30, 2026 | In progress filed Oct 2026, not yet issued | 2425 22nd Av | tub to 60"x30" walk-in shower conversion in existing full bath. drain location to remain. no changes to layout.Details
tub to 60"x30" walk-in shower conversion in existing full bath. drain location to remain. no changes to layout. | $11,000 |
| Oct 22, 2026 | In progress issued Oct 2026 | 785 Panorama Dr | remove existing shower replace with new shower pan, shower fixtures and accessories. drain to remain. no structural, electrical and mechanical work.Details
remove existing shower replace with new shower pan, shower fixtures and accessories. drain to remain. no structural, electrical and mechanical work. | $9,535 |
| Oct 22, 2026 | In progress issued Oct 2026 | 1475 45th Av | remove existing bathtub/shower. replace with new showerpan/shower. drain remain in place. toilet, vanity, window bathroom configuration remain unchanged.Details
remove existing bathtub/shower. replace with new showerpan/shower. drain remain in place. toilet, vanity, window bathroom configuration remain unchanged. | $10,000 |
| Oct 7, 2026 | In progress issued Oct 2026 | 121 Nautilus Dr | tub to shower conversion in existing full bath.Details
tub to shower conversion in existing full bath. | $21,989 |
| Sep 23, 2026 | In progress issued Oct 2026 | 530 17th Av | remove existing tub/shower. install new shower pan. no electrical.Details
remove existing tub/shower. install new shower pan. no electrical. | $10,676 |
| Sep 23, 2026 | In progress issued Oct 2026 | 210 Vienna St | tub to shower conversion. drain and valve location remain. installing acrylic walls and shower pan.Details
tub to shower conversion. drain and valve location remain. installing acrylic walls and shower pan. | $19,336 |
| Sep 11, 2026 | In progress issued Sep 2026 | 1927 34th Av | tub to shower conversion, footprint & drain placement remain the same.Details
tub to shower conversion, footprint & drain placement remain the same. | $10,000 |
| Sep 11, 2026 | In progress issued Sep 2026 | 104 Congdon St | remove existing tub/shower. install new walk in shower/tub.Details
remove existing tub/shower. install new walk in shower/tub. | $12,500 |
| Sep 11, 2026 | In progress issued Sep 2026 | 359 Staples Av | first floor bathroom shower to shower remodel, footprint remains unchanged.Details
first floor bathroom shower to shower remodel, footprint remains unchanged. | $11,450 |
| Aug 18, 2026 | In progress issued Aug 2026 | 1534 Irving St | unit 102: tub to shower conversionDetails
unit 102: tub to shower conversion | $10,840 |
| Aug 6, 2026 | In progress issued Aug 2026 | 1715 48th Av | tub/shower to shower. | $9,500 |
| Aug 6, 2026 | In progress issued Aug 2026 | 1275 24th Av | upper unit -tub to shower bath remodel.Details
upper unit -tub to shower bath remodel. | $9,000 |
| Aug 6, 2026 | In progress issued Aug 2026 | 415 Ulloa St | tub to shower conversion to (e) bathroom.Details
tub to shower conversion to (e) bathroom. | $9,500 |
| Aug 6, 2026 | Expired or cancelled cancelled Aug 2026 | 1959 34th Av | tub shower to shower bath remodel.Details
tub shower to shower bath remodel. | $9,500 |
| Aug 6, 2026 | In progress issued Aug 2026 | 77 Collingwood St | tub/shower to shower bath remodel.Details
tub/shower to shower bath remodel. | $9,500 |
| Aug 6, 2026 | In progress issued Aug 2026 | 43 Robblee Av | tub to shower conversion to (e) bathroom.Details
tub to shower conversion to (e) bathroom. | $9,500 |
| Jul 30, 2026 | In progress issued Aug 2026 | 1800 46th Av | unit #301 3rd fl: remove one (e) 59x28 1/2in tub & (e) wet area. install one new 60x30in prefabricated shower receptor w/approx 5-1/5in threshold. install new presure-balanced shower valve, handheld shower fixture, right side drain connection, two shelves, 16in & 24in grab bars...Details
unit #301 3rd fl: remove one (e) 59x28 1/2in tub & (e) wet area. install one new 60x30in prefabricated shower receptor w/approx 5-1/5in threshold. install new presure-balanced shower valve, handheld shower fixture, right side drain connection, two shelves, 16in & 24in grab bars... | $9,500 |
| Jul 30, 2026 | In progress issued Aug 2026 | 260 Saint Charles Av | 1st fl: remove one (e) 58-1/2 inch tub & (e) wet area, install one new 60x30 inch prefabricated barrier-free shower receptor w/ 1 inch threshold. install smooth alabaster white acrylic wall panels to 96in above finish fl. install new pressure-balanced shower valve,handheld shower fixture..Details
1st fl: remove one (e) 58-1/2 inch tub & (e) wet area, install one new 60x30 inch prefabricated barrier-free shower receptor w/ 1 inch threshold. install smooth alabaster white acrylic wall panels to 96in above finish fl. install new pressure-balanced shower valve,handheld shower fixture.. | $9,500 |
| Jul 17, 2026 | In progress issued Jul 2026 | 425 Holyoke St | replace (e) shower with new shower fixture, tile demo, install 32"x48" ez step pan, midnight storm smoothwalls, 48" concealed roller clear glass door, vazia trim and fixture. no other workDetails
replace (e) shower with new shower fixture, tile demo, install 32"x48" ez step pan, midnight storm smoothwalls, 48" concealed roller clear glass door, vazia trim and fixture. no other work | $9,500 |
| Jul 17, 2026 | In progress issued Jul 2026 | 47 Prague St | convert tub to shower, tile demo 134 x60, ez step pan, sandstone marble, 60" roller glass door, aperto trim and fixtures.Details
convert tub to shower, tile demo 134 x60, ez step pan, sandstone marble, 60" roller glass door, aperto trim and fixtures. | $9,500 |
| Jul 15, 2026 | In progress issued Jul 2026 | 1292 29th Av | tub to shower replacement. | $17,306 |
| Jul 15, 2026 | In progress issued Jul 2026 | 1062 Alabama St | remove existing bathtub and tile surround. install new 66"x30" shower base. install acrylic wall surround. install new pressure balanced shower valve.Details
remove existing bathtub and tile surround. install new 66"x30" shower base. install acrylic wall surround. install new pressure balanced shower valve. | $8,500 |
| Jul 15, 2026 | In progress issued Jul 2026 | 22 Joost Av | remove existing bathtub and wall finishes. install custom 64"x32" shower pan. install smooth acrylic wall surround.install new chome shower valve & shower head. install grab bars & prairie shelves. no other workDetails
remove existing bathtub and wall finishes. install custom 64"x32" shower pan. install smooth acrylic wall surround.install new chome shower valve & shower head. install grab bars & prairie shelves. no other work | $8,500 |
| Jul 13, 2026 | In progress issued Jul 2026 | 2872 Golden Gate Av | convert tub to shower, tile demo, 30" x 60" (au), 4 flange pan. alabaster white smooth walls & 2 window, trim kits, 1 additional prairie shelf, vazia (ch) trim & fixtures. l-shaped shower rod. window not facing to the street.Details
convert tub to shower, tile demo, 30" x 60" (au), 4 flange pan. alabaster white smooth walls & 2 window, trim kits, 1 additional prairie shelf, vazia (ch) trim & fixtures. l-shaped shower rod. window not facing to the street. | $9,500 |
| Jul 13, 2026 | In progress issued Jul 2026 | 2070 36th Av | remove (e) shower & wall surrounds. install new jacuzzi shower system with standard shower pan, alabaster white subway tile wall surrounds, chrome aperto fixtures, prairie shelves, grab bars & clear dual bypass sliding shower enclosure. reconnect (e) plumbing in same location. remove (e) bathtub &Details
remove (e) shower & wall surrounds. install new jacuzzi shower system with standard shower pan, alabaster white subway tile wall surrounds, chrome aperto fixtures, prairie shelves, grab bars & clear dual bypass sliding shower enclosure. reconnect (e) plumbing in same location. remove (e) bathtub & | $17,000 |
| Jun 29, 2026 | In progress issued Jul 2026 | 2 Young Ct | install (n) shower pan, tile demo, replace double glass door, and add 30 inch grab bar, shower seat, repair trim and fixtures.Details
install (n) shower pan, tile demo, replace double glass door, and add 30 inch grab bar, shower seat, repair trim and fixtures. | $13,000 |
| Jun 29, 2026 | In progress issued Jul 2026 | 1227 28th Av | convert tub to shower, tile demo, replace glass door, and add 30 inch grab bar, repair trim and fixtures, shower only.Details
convert tub to shower, tile demo, replace glass door, and add 30 inch grab bar, repair trim and fixtures, shower only. | $10,000 |
| Jun 18, 2026 | In progress issued Jun 2026 | 6930 Fulton St | bathroom remodel, tub to showerDetails
bathroom remodel, tub to shower | $10,300 |
| Jun 3, 2026 | In progress issued Jul 2026 | 241 Granada Av | tub to shower, tile demo, 320x60in (aw) std. 5-1/2in (r) pan. platinum grey smooth walls sperto trim & fixtures. curved shower rod.Details
tub to shower, tile demo, 320x60in (aw) std. 5-1/2in (r) pan. platinum grey smooth walls sperto trim & fixtures. curved shower rod. | $8,500 |
| May 6, 2026 | In progress filed May 2026, not yet issued | 1534 Irving St | (1) tub to shower conversion plans required . | $2,500 |
| May 1, 2026 | In progress issued Jun 2026 | 221 Kalmanovitz St | tub to shower conversion in one existing bathroomDetails
tub to shower conversion in one existing bathroom | $19,913 |
| May 1, 2026 | In progress issued Jun 2026 | 32 Crescent Av | tub to shower conversion | $23,405 |