Back to bathroom remodel contractors
Bath Fitter Northern California
- Based in
- Sacramento
- On San Francisco permits
- Nov 2014 to Mar 2026
- Last 24 months
- 1 permit filed
7 permits since 2000: 3 completed, 1 in progress, 3 never finaled.
Of the 3 never-finaled permits, 3 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
4 bathroom remodel permits: 3 completed, 1 in progress. Typically 0 days from filing to permit and 104 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 5, 2026 | Completed final sign-off Apr 2026 | 1350 California St | unit 207: master bath: replace only. free standing shower base, shower stall, shower door, corner shelf, trim kit, grab bar like for like. hall bath: tub.shower replace only, free standing tub, shower walls, tub door, shelf grab bar. corner shelf, grab bar, trim kit, valve.Details
unit 207: master bath: replace only. free standing shower base, shower stall, shower door, corner shelf, trim kit, grab bar like for like. hall bath: tub.shower replace only, free standing tub, shower walls, tub door, shelf grab bar. corner shelf, grab bar, trim kit, valve. | $29,000 |
| Aug 22, 2024 | In progress issued Aug 2024 | 215 07th Av | unit #5 minor bath remodel: replace and install (n) free standing shower base, shower wall, corner shelff, trim kit, valve, grab bar & doorsDetails
unit #5 minor bath remodel: replace and install (n) free standing shower base, shower wall, corner shelff, trim kit, valve, grab bar & doors | $12,352 |
| Jun 20, 2024 | Completed final sign-off Oct 2024 | 3524 California St | one bath remodel (partial): replace and install new tub liner, corner shelves, trim kit, valve, slide bar/hand shower, grab bar, shower rod.Details
one bath remodel (partial): replace and install new tub liner, corner shelves, trim kit, valve, slide bar/hand shower, grab bar, shower rod. | $9,955 |
| Mar 29, 2019 | Completed final sign-off Feb 2021 | 253 Parque Dr | convert piping to copper in bathroom reconfigure wood studs to allow proper drain pipe to be installed. replace existing closure tile with acrylic fabricated piece.Details
convert piping to copper in bathroom reconfigure wood studs to allow proper drain pipe to be installed. replace existing closure tile with acrylic fabricated piece. | $2,506 |