Back to bathroom remodel contractors
Basich Construction
- Based in
- San Francisco
- On San Francisco permits
- Mar 2000 to Mar 2007
- Last 24 months
- 0 permits filed
21 permits since 2000: 17 completed, 1 never finaled, 3 expired or cancelled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
3 bathroom remodel permits: 3 completed. Typically 0 days from filing to permit and 51 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 8, 2007 | Completed final sign-off May 2007 | 62 Everglade Dr | bathroom remodel- remove all existing tiles on the floor and wall. remove any damaged sheetrock and wood in the area. install new tiles, new tub, vanity and shower pan.Details
bathroom remodel- remove all existing tiles on the floor and wall. remove any damaged sheetrock and wood in the area. install new tiles, new tub, vanity and shower pan. | $10,000 |
| Jul 24, 2000 | Completed final sign-off Aug 2000 | 2241 Cayuga Av | bathroom remodel, install new sheetrock, install new tile, etcDetails
bathroom remodel, install new sheetrock, install new tile, etc | $7,500 |
| Mar 7, 2000 | Completed final sign-off Apr 2000 | 2237 Cayuga Av | bathroom remodelDetails
bathroom remodel |