Back to bathroom remodel contractors
Bashaw Construction
- Based in
- San Francisco
- On San Francisco permits
- Apr 2017 to May 2023
- Last 24 months
- 0 permits filed
12 permits since 2000: 7 completed, 4 never finaled, 1 expired or cancelled.
Of the 4 never-finaled permits, 1 is 3 to 5 years old, 3 are 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
5 bathroom remodel permits: 3 completed, 1 never finaled, 1 expired or cancelled. Typically 2 days from filing to permit and 164 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| May 24, 2023 | Never finaled issued May 2023, no final | 636 Hyde St | unit 101: remove moldy sheetrock replace with new insulation possiply. bath & kitchen remodel.Details
unit 101: remove moldy sheetrock replace with new insulation possiply. bath & kitchen remodel. | $50,000 |
| Jun 27, 2019 | Completed final sign-off Dec 2019 | 122 Gambier St | remodel existing bathroom, new plumbing fixtures in bathroom, sink, toilet, 1 new ceiling fan, 5 can lights, new tiles and cabinets.Details
remodel existing bathroom, new plumbing fixtures in bathroom, sink, toilet, 1 new ceiling fan, 5 can lights, new tiles and cabinets. | $53,334 |
| Jun 10, 2019 | Expired or cancelled cancelled Oct 2022 | 1123 Carolina St | basement: new 2nd conditioned dwelling unit space via excavation. new internal stairs, add two new shed dormers, new bath on 2nd floor, new rear deck at 2nd floor. remodeling (e) upper bathroom.Details
basement: new 2nd conditioned dwelling unit space via excavation. new internal stairs, add two new shed dormers, new bath on 2nd floor, new rear deck at 2nd floor. remodeling (e) upper bathroom. | $140,000 |
| Aug 7, 2017 | Completed final sign-off Sep 2017 | 701 Minnesota St | #118- remodel bathroom in kind, same location, no moving of windows, doors or walls. demo sheetrock, existing plumbing, electrical fixtures & flooring, install new sheetrock, rough plumbing & electrical, install new tile @ bath & floor, new sheetrock will be painted.Details
#118- remodel bathroom in kind, same location, no moving of windows, doors or walls. demo sheetrock, existing plumbing, electrical fixtures & flooring, install new sheetrock, rough plumbing & electrical, install new tile @ bath & floor, new sheetrock will be painted. | $19,000 |
| Apr 27, 2017 | Completed final sign-off Jul 2018 | 388 Connecticut St | interior remodel, guest bath, new vanity & tile, lav, light fixtures, exhaust fan; master bath, new tile & vanity, lav, tub light fixtures, exhaust fan; kitchen, new cabinets, tile, floor; living room, hardwood floor; replace entry door same location; replace all in same location.Details
interior remodel, guest bath, new vanity & tile, lav, light fixtures, exhaust fan; master bath, new tile & vanity, lav, tub light fixtures, exhaust fan; kitchen, new cabinets, tile, floor; living room, hardwood floor; replace entry door same location; replace all in same location. | $97,000 |