Back to bathroom remodel contractors
Bartkus Remodel
- Based in
- Petaluma
- On San Francisco permits
- Nov 2009 to May 2026
- Last 24 months
- 3 permits filed
22 permits since 2000: 16 completed, 1 in progress, 4 never finaled, 1 expired or cancelled.
Of the 4 never-finaled permits, 1 is 3 to 5 years old, 2 are 5 to 10 years old, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
10 bathroom remodel permits: 9 completed, 1 never finaled. Typically 0 days from filing to permit and 274 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 1, 2021 | Completed final sign-off Feb 2022 | 2200 Sacramento St | build soffit in living room to horse 6-8 led lights (16"x20'). tile master shower walls, guest bath wall (install new tilable shower pan) paint unit. upgrade (e) electrical panel in closet. move out of closet, mount in wall just inside front door. run 2 dedicated lines to each bath for new toilets.Details
build soffit in living room to horse 6-8 led lights (16"x20'). tile master shower walls, guest bath wall (install new tilable shower pan) paint unit. upgrade (e) electrical panel in closet. move out of closet, mount in wall just inside front door. run 2 dedicated lines to each bath for new toilets. | $35,000 |
| Jun 4, 2021 | Completed final sign-off Apr 2024 | 774 45th Av | 1st fl: add a bathroom. 2nd fl: remodel (e) kitchen & bathroom, add a laundry room. 3rd fl: add a bathroom; replace (e) front windows in-kind.Details
1st fl: add a bathroom. 2nd fl: remodel (e) kitchen & bathroom, add a laundry room. 3rd fl: add a bathroom; replace (e) front windows in-kind. | $90,000 |
| May 3, 2021 | Completed final sign-off Oct 2022 | 2200 Sacramento St | unit 1504: remove existing cabinets in kitchen. install new fixtures & appliances. 1/2 bath remodel; tile floor. guest bath; new sheet rock and file floor. no modify walls, like for likeDetails
unit 1504: remove existing cabinets in kitchen. install new fixtures & appliances. 1/2 bath remodel; tile floor. guest bath; new sheet rock and file floor. no modify walls, like for like | $40,000 |
| Nov 13, 2020 | Never finaled issued Mar 2021, no final | 2200 Sacramento St | #1201: renovate kitchen, (n) appliances, plumbing fixtures, electrical wiring, fixtures & outlets. renovate 2 baths. (n) led light fixtures. (n) flooring.Details
#1201: renovate kitchen, (n) appliances, plumbing fixtures, electrical wiring, fixtures & outlets. renovate 2 baths. (n) led light fixtures. (n) flooring. | $450,000 |
| Jun 17, 2019 | Completed final sign-off Sep 2019 | 829 Corbett Av | remove/replace shower stall in bathDetails
remove/replace shower stall in bath | $4,000 |
| Oct 15, 2018 | Completed final sign-off Sep 2019 | 2200 Sacramento St | knock down texture all ceiling, prine/paint/install new kitchen cabinets, granite counter tops, new center island w/cabinets, new shower pa in guest both tile on wall at showr fl/ both floor remodel master bath, new vanity/tub/tile, new engineered wood flrs. and baseboard, all electric/plumbingDetails
knock down texture all ceiling, prine/paint/install new kitchen cabinets, granite counter tops, new center island w/cabinets, new shower pa in guest both tile on wall at showr fl/ both floor remodel master bath, new vanity/tub/tile, new engineered wood flrs. and baseboard, all electric/plumbing | $150,000 |
| Sep 17, 2014 | Completed final sign-off Nov 2014 | 600 Chestnut St | demo extg and remove tub vanity and toilet. install new electric , toilet, shower pan, upgrade plmb, install new vanity, tile shower walls and bath floor.Details
demo extg and remove tub vanity and toilet. install new electric , toilet, shower pan, upgrade plmb, install new vanity, tile shower walls and bath floor. | $20,000 |
| Jan 21, 2014 | Completed final sign-off Oct 2014 | 2200 Sacramento St | unit 608:remove partiton wall between living room and bedroom. install sliding pocket glass doors. new upper lower cabinets at kitchen. elec/lighting, remodel master bath, new toilet and walk in shower. new engineered hardwood floors. unit will change from 1 bedroom to 2 bedroom. masterbath remodelDetails
unit 608:remove partiton wall between living room and bedroom. install sliding pocket glass doors. new upper lower cabinets at kitchen. elec/lighting, remodel master bath, new toilet and walk in shower. new engineered hardwood floors. unit will change from 1 bedroom to 2 bedroom. masterbath remodel | $60,000 |
| Nov 4, 2013 | Completed final sign-off Oct 2014 | 2200 Sacramento St | unit 608: demo kitchen & bathDetails
unit 608: demo kitchen & bath | $3,500 |
| Nov 19, 2009 | Completed final sign-off Mar 2010 | 1835 Franklin St | replace extg kitchen cabinets, tile guest bathroom and floor. replace guest and master bath vanities. paint unit #1403(2 bathrooms)no structural and no walls relocation. no new lighting and exhaust fans.Details
replace extg kitchen cabinets, tile guest bathroom and floor. replace guest and master bath vanities. paint unit #1403(2 bathrooms)no structural and no walls relocation. no new lighting and exhaust fans. | $5,200 |