Back to bathroom remodel contractors
Barry O Mahony Construction
- Based in
- San Francisco
- On San Francisco permits
- Mar 2025 to Sep 2026
- Last 24 months
- 7 permits filed
7 permits since 2000: 6 completed, 1 in progress.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
3 bathroom remodel permits: 3 completed. Typically 36 days from filing to permit and 181 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 26, 2025 | Completed final sign-off May 2026 | 74 Prospect Av | revision to pa# 202508193407: at (e) second floor bedrooms, remove (e) closets and fireplace. (n) bathroom, closets, doors, fixtures, and finishes.Details
revision to pa# 202508193407: at (e) second floor bedrooms, remove (e) closets and fireplace. (n) bathroom, closets, doors, fixtures, and finishes. | $102,491 |
| Aug 19, 2025 | Completed final sign-off May 2026 | 74 Prospect Av | at existing 2nd floor bathroom, remove existing closet and enlarge existing bathroom. install new fixtures and finishes. non load bearing wall, no structural work.Details
at existing 2nd floor bathroom, remove existing closet and enlarge existing bathroom. install new fixtures and finishes. non load bearing wall, no structural work. | $29,000 |
| Mar 10, 2025 | Completed final sign-off Sep 2025 | 3575 Pierce St | expansion of ground floor garden garden unit (no street frontage) in an existing 3-story, 3 unit residence construction in 1927. new infill area to include a bedroom space, relocation of th entry, kitchen and bathroom, with a total addition of 106 sq ft on ground fl.Details
expansion of ground floor garden garden unit (no street frontage) in an existing 3-story, 3 unit residence construction in 1927. new infill area to include a bedroom space, relocation of th entry, kitchen and bathroom, with a total addition of 106 sq ft on ground fl. | $20,000 |