Back to bathroom remodel contractors
Barker Construction
- Based in
- Menlo Park
- On San Francisco permits
- Nov 2012 to Sep 2013
- Last 24 months
- 0 permits filed
7 permits since 2000: 5 completed, 2 never finaled.
Of the 2 never-finaled permits, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
5 bathroom remodel permits: 4 completed, 1 never finaled. Typically 0 days from filing to permit and 66 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 11, 2013 | Completed final sign-off Aug 2013 | 2334 25th St | interior renovation unit #2334, new kitchen finishes, cabinets, counter tops, fixtures and appliances. new bathroom finishes, casework and fixtures. replace 2 exterior windows not visable from street with same size window in existing opening, repair/replace gypsum board in living room and bedroom.Details
interior renovation unit #2334, new kitchen finishes, cabinets, counter tops, fixtures and appliances. new bathroom finishes, casework and fixtures. replace 2 exterior windows not visable from street with same size window in existing opening, repair/replace gypsum board in living room and bedroom. | $26,000 |
| Apr 2, 2013 | Completed final sign-off Jul 2013 | 2332 25th St | work in unit 2330: int. finishes to 1 unit (one kitchen and one bathroom remodel) new kitchen cabinets, sink, counters and floor finishes, appliances, etc. repair washer/dryer hookups. new bathroom fixtures and floforing, replace 9e) 4 windows (not visible from street) with new replacement windows.Details
work in unit 2330: int. finishes to 1 unit (one kitchen and one bathroom remodel) new kitchen cabinets, sink, counters and floor finishes, appliances, etc. repair washer/dryer hookups. new bathroom fixtures and floforing, replace 9e) 4 windows (not visible from street) with new replacement windows. | $20,000 |
| Mar 21, 2013 | Completed final sign-off May 2013 | 2332 25th St | like for like interior finishes to 1 unit. one kitchen remodelieng and one bath remodeling. new kitchen cabinets, sink, counters and floor finish. repair washer/dryer hookups and new bathroom fixtures and flooring.replace (e) 5 windows with new replacement windows in (e) rough opening within thisDetails
like for like interior finishes to 1 unit. one kitchen remodelieng and one bath remodeling. new kitchen cabinets, sink, counters and floor finish. repair washer/dryer hookups and new bathroom fixtures and flooring.replace (e) 5 windows with new replacement windows in (e) rough opening within this | $20,000 |
| Nov 26, 2012 | Completed final sign-off Feb 2013 | 2950 21st St | new bathroom in existing groceryDetails
new bathroom in existing grocery | $10,000 |
| Nov 20, 2012 | Never finaled issued Dec 2012, no final | 780 Treat Av | interior finish upgrade and kitchen/bath upgrade to (2) residential units. removal of existing non structural brick fireplaces.Details
interior finish upgrade and kitchen/bath upgrade to (2) residential units. removal of existing non structural brick fireplaces. | $30,000 |