Back to bathroom remodel contractors
Barcci Builders Inc
- Based in
- Los Gatos
- On San Francisco permits
- Nov 2021 to Sep 2026
- Last 24 months
- 29 permits filed
69 permits since 2000: 43 completed, 19 in progress, 3 never finaled, 4 expired or cancelled.
Of the 3 never-finaled permits, 3 are 3 to 5 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
37 bathroom remodel permits: 22 completed, 9 in progress, 2 never finaled, 4 expired or cancelled. Typically 0 days from filing to permit and 212 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 3, 2026 | In progress issued Aug 2026 | 1027 Lincoln Wy | interior remodel like for like kitchen; (n) powder rm, laundry rm and 2nd fl bath remodel; install (n) non load bearing int'r partitions, limited (n) ext'r wall framing; replacement on (e) window/(n) (e) hinged door while retaining (e) header; replacement of selected doors, relocating orDetails
interior remodel like for like kitchen; (n) powder rm, laundry rm and 2nd fl bath remodel; install (n) non load bearing int'r partitions, limited (n) ext'r wall framing; replacement on (e) window/(n) (e) hinged door while retaining (e) header; replacement of selected doors, relocating or | $80,000 |
| Jul 22, 2026 | In progress filed Jul 2026, not yet issued | 50 Lansing St | remodel of (2) bathrooms, like for like, electrical & plumbing work no layout change. replace (e) toilet and shower.Details
remodel of (2) bathrooms, like for like, electrical & plumbing work no layout change. replace (e) toilet and shower. | $42,000 |
| Mar 9, 2026 | Completed final sign-off May 2026 | 1301 Kansas St | bathroom remodel like for like.Details
bathroom remodel like for like. | $25,000 |
| Sep 12, 2025 | In progress issued Sep 2025 | 16 Miraloma Dr | remodel of bathroom like for like.Details
remodel of bathroom like for like. | $20,000 |
| Aug 19, 2025 | In progress issued Sep 2025 | 720 Waller St | remodel kitchen, bathroom, dressing area of the house. remove wall between bedroom & kitchen, replace w/ parallel to the side walls. kitchen reconfiguration w/ new appliances. wall between living room & dining room to be opened & beam install. replace skylight w. new, add 2 skylight.Details
remodel kitchen, bathroom, dressing area of the house. remove wall between bedroom & kitchen, replace w/ parallel to the side walls. kitchen reconfiguration w/ new appliances. wall between living room & dining room to be opened & beam install. replace skylight w. new, add 2 skylight. | $85,000 |
| Aug 4, 2025 | Completed final sign-off May 2026 | 712 Bay St | kitchen & bathroom remodel, like for like.Details
kitchen & bathroom remodel, like for like. | $45,000 |
| Jul 3, 2025 | Completed final sign-off Mar 2026 | 469 Clipper St | 1/f: bathroom remodel. add new bedroom. existing bedroom #2 remodeling.Details
1/f: bathroom remodel. add new bedroom. existing bedroom #2 remodeling. | $40,000 |
| May 15, 2025 | Completed final sign-off Sep 2025 | 2472 Clay St | 3/fl- full bathroom additionDetails
3/fl- full bathroom addition | $30,000 |
| Apr 15, 2025 | Expired or cancelled expired Jun 2026 | 392 Elizabeth St | relocation of kitchen equipment, electrical and lighting fixtures, update plumbing fixtures, washer and dryer unit; bathroom reconfigure removing non structural wall; update vanity and toilet update electrical fixtures; remove pony wallDetails
relocation of kitchen equipment, electrical and lighting fixtures, update plumbing fixtures, washer and dryer unit; bathroom reconfigure removing non structural wall; update vanity and toilet update electrical fixtures; remove pony wall | $60,000 |
| Apr 14, 2025 | Completed final sign-off Nov 2025 | 214 Putnam St | 2 bathrooms remodeling like for like.Details
2 bathrooms remodeling like for like. | $38,500 |
| Feb 20, 2025 | Completed final sign-off May 2025 | 1139 Shrader St | bathroom remodel like for like.Details
bathroom remodel like for like. | $22,000 |
| Jan 29, 2025 | In progress issued Jan 2025 | 2450 Market St | unit #302: kitchen remodeling like for like. replace plumbing fixtures & outlets at kithcen. replace plumbing fixtures & shower pan at bathroom. update e/m/p up to code.Details
unit #302: kitchen remodeling like for like. replace plumbing fixtures & outlets at kithcen. replace plumbing fixtures & shower pan at bathroom. update e/m/p up to code. | $80,000 |
| Jan 13, 2025 | Completed final sign-off Jun 2025 | 918 Noe St | bathroom remodeling like for like - replace free standing tub and shower. 3 recess lights, fan, replace all plumbing fixtures.Details
bathroom remodeling like for like - replace free standing tub and shower. 3 recess lights, fan, replace all plumbing fixtures. | $30,000 |
| Dec 27, 2024 | In progress issued Jun 2025 | 2524 Post St | remodel e) kitchen & bathroom on top fl unit. removel of wall btw kitchen & dining room, removal currently abandoned flues. moving 1 bathroom window & other associated adjustment to interior door. a new sub panel is to be installed for all updated & new circuitsDetails
remodel e) kitchen & bathroom on top fl unit. removel of wall btw kitchen & dining room, removal currently abandoned flues. moving 1 bathroom window & other associated adjustment to interior door. a new sub panel is to be installed for all updated & new circuits | $40,000 |
| Dec 1, 2024 | In progress issued Jul 2025 | 125 Stanyan St | 1/f: add (1)living room, (1)bedroom, (1)bath and (1)office, add wall to seaparate garage and new living space, add washer & dryer, add (1)new heat-pump fau for 1/f use. 2/f: incorporate atrium into living space, removing wall between kitchen and atrium and side room, add (1)bath, kitchen & (e) bath.Details
1/f: add (1)living room, (1)bedroom, (1)bath and (1)office, add wall to seaparate garage and new living space, add washer & dryer, add (1)new heat-pump fau for 1/f use. 2/f: incorporate atrium into living space, removing wall between kitchen and atrium and side room, add (1)bath, kitchen & (e) bath. | $200,000 |
| Nov 26, 2024 | Completed final sign-off Feb 2026 | 1301 Kansas St | bathroom remodel on 2nd floor.Details
bathroom remodel on 2nd floor. | $33,728 |
| Oct 8, 2024 | Completed final sign-off Jul 2025 | 3100 Kirkham St | guest bathroom remodel like for likeDetails
guest bathroom remodel like for like | $22,000 |
| Sep 27, 2024 | Completed final sign-off Apr 2025 | 170 Corwin St | 2 bathrooms and kitchen remodel like for like.Details
2 bathrooms and kitchen remodel like for like. | $50,000 |
| Sep 26, 2024 | Completed final sign-off Apr 2025 | 71 Los Palmos Dr | expand 1st fl half bath to full bath. relocate (e) water heaterDetails
expand 1st fl half bath to full bath. relocate (e) water heater | $40,000 |
| Sep 10, 2024 | Completed final sign-off Feb 2025 | 999 Green St | kitchen and masterbath remodel. bathroom 1 & 2 remodel like for like. sub panel 120 amp replacement.new washer & dryer closetDetails
kitchen and masterbath remodel. bathroom 1 & 2 remodel like for like. sub panel 120 amp replacement.new washer & dryer closet | $80,000 |
| May 23, 2024 | In progress issued Jul 2024 | 728 Shrader St | remove walls inside the house, kitchen remodel, pantry reconfigureation, add 1 new bath, add 1 office, remove master bedroom and dining fireplaces's cover. thinning the wall between master bedroom and new bath relocate (e) water heater. ref pa# 202403150050.Details
remove walls inside the house, kitchen remodel, pantry reconfigureation, add 1 new bath, add 1 office, remove master bedroom and dining fireplaces's cover. thinning the wall between master bedroom and new bath relocate (e) water heater. ref pa# 202403150050. | $150,000 |
| Feb 29, 2024 | Completed final sign-off Jul 2025 | 3643 25th St | remove fire place from units 3645a and 3643. add 1 new bath to unit 3645a and 3643. kitchen remodling for units 3645a and 3643. electrical wiring upgrade for units 3645a and 3643.1 bathroom remodel.Details
remove fire place from units 3645a and 3643. add 1 new bath to unit 3645a and 3643. kitchen remodling for units 3645a and 3643. electrical wiring upgrade for units 3645a and 3643.1 bathroom remodel. | $60,000 |
| Jan 22, 2024 | In progress issued Feb 2024 | 775 27th St | interior renovation of the garage space of the house. add bathroom, (1) storage, 1 laundry roomDetails
interior renovation of the garage space of the house. add bathroom, (1) storage, 1 laundry room | $45,000 |
| Jan 2, 2024 | Completed final sign-off Nov 2024 | 117 Albion St | kitchen & bathroom remodel, add laundry and mudroom.Details
kitchen & bathroom remodel, add laundry and mudroom. | $40,000 |
| Sep 1, 2023 | Never finaled issued Sep 2023, no final | 568 02nd Av | revision to permit #202307202627. changing from full house rewire to work in kitchen, bathroom, hallway, and bedroom only. sub panel upgrade.Details
revision to permit #202307202627. changing from full house rewire to work in kitchen, bathroom, hallway, and bedroom only. sub panel upgrade. | |
| Jun 2, 2023 | Expired or cancelled cancelled Mar 2024 | 56 Mizpah St | remove wall + door between powder room + workshop. seal (e) wall openings + add new opening per drawings. remove window at kitchen. provide new kitchen cabinets, plumbing fixtures, and appliances at new locations. new bathroom plumbing at new location. upgrade lighting + electrical.Details
remove wall + door between powder room + workshop. seal (e) wall openings + add new opening per drawings. remove window at kitchen. provide new kitchen cabinets, plumbing fixtures, and appliances at new locations. new bathroom plumbing at new location. upgrade lighting + electrical. | $25,000 |
| May 23, 2023 | Completed final sign-off Dec 2023 | 434 Arguello Bl | bathroom remodel like for like.Details
bathroom remodel like for like. | $25,000 |
| Apr 13, 2023 | Never finaled issued Apr 2023, no final | 568 02nd Av | 2 bathroom remodel like for like. no struc work.Details
2 bathroom remodel like for like. no struc work. | $70,000 |
| Feb 7, 2023 | Completed final sign-off May 2023 | 58 Digby St | bathroom remodel like for like - tubDetails
bathroom remodel like for like - tub | $30,000 |
| Jan 23, 2023 | Expired or cancelled cancelled Jan 2026 | 1045 Divisadero St | bathroom remodeling: like for like - new vanity, toilet, shower unit, electrical gfc, outlets.Details
bathroom remodeling: like for like - new vanity, toilet, shower unit, electrical gfc, outlets. | $25,000 |
| Jan 5, 2023 | Expired or cancelled cancelled Jan 2023 | 3448 18th St | 1-bathroom & 1-kitchen remodel, like for likeDetails
1-bathroom & 1-kitchen remodel, like for like | $25,000 |
| Oct 7, 2022 | Completed final sign-off Nov 2022 | 5517 Diamond Heights Bl | like for like bathroom remodel: same locations plumbing and electicalDetails
like for like bathroom remodel: same locations plumbing and electical | $10,000 |
| Jun 13, 2022 | Completed final sign-off Jul 2024 | 355 01st St | interior remodel of condominium unit in a high rise. replace bathroom and kitchen finsihes, fixtures and case works; add one interior partition wall; add soffit and tray ceiling for lighting fixtures, convert part of the living space into one bedroom. no modification to sprinklers.Details
interior remodel of condominium unit in a high rise. replace bathroom and kitchen finsihes, fixtures and case works; add one interior partition wall; add soffit and tray ceiling for lighting fixtures, convert part of the living space into one bedroom. no modification to sprinklers. | $90,000 |
| May 4, 2022 | Completed final sign-off Aug 2022 | 2419 27th Av | bathroom remodel @ ground fl: walk-in shower unit, new gfci outlets, replace out of the wall plumbing, install new flooring, paint, vanity.Details
bathroom remodel @ ground fl: walk-in shower unit, new gfci outlets, replace out of the wall plumbing, install new flooring, paint, vanity. | $12,000 |
| Apr 12, 2022 | Completed final sign-off Jul 2022 | 668 29th St | unit #b: complete kitchen and 1 bathroom remodel. like for like, no walls or layout change.Details
unit #b: complete kitchen and 1 bathroom remodel. like for like, no walls or layout change. | $45,000 |
| Mar 17, 2022 | Completed final sign-off Sep 2022 | 436 Tehama St | kitchen remodel: relocate stove, new cabinets and counter tops. gfci out of wall plumbing and flooring. bathrooms: like for like gfci out of wall plumbing and flooring. 436a, 438b,438c, & 436cDetails
kitchen remodel: relocate stove, new cabinets and counter tops. gfci out of wall plumbing and flooring. bathrooms: like for like gfci out of wall plumbing and flooring. 436a, 438b,438c, & 436c | $50,000 |
| Mar 15, 2022 | Completed final sign-off May 2023 | 730 Shrader St | 1) kitchen remodel, remove wall between kitchen and living room & wall between kitchen & sunroom. 2) add one new three fixture bathroom. 3) convert living room into bedroom. convert sunroom into dining room.Details
1) kitchen remodel, remove wall between kitchen and living room & wall between kitchen & sunroom. 2) add one new three fixture bathroom. 3) convert living room into bedroom. convert sunroom into dining room. | $36,000 |