Back to bathroom remodel contractors
Bao Hengda Inc
- Based in
- San Francisco
- On San Francisco permits
- Dec 2019 to Sep 2026
- Last 24 months
- 8 permits filed
19 permits since 2000: 13 completed, 5 in progress, 1 never finaled.
Of the 1 never-finaled permit, 1 is 3 to 5 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
12 bathroom remodel permits: 9 completed, 3 in progress. Typically 10 days from filing to permit and 161 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 9, 2026 | In progress issued Sep 2026 | 1452 Clement St | new infill building addition at existing first floor level. new sitting room, new windows. renovate existing first floor living room. renovate existing first floor bathroom.Details
new infill building addition at existing first floor level. new sitting room, new windows. renovate existing first floor living room. renovate existing first floor bathroom. | $150,000 |
| May 21, 2026 | Completed final sign-off Oct 2026 | 1428 18th Av | in-kind remodeling of 1 kitchen(s) in 2nd fl and in-kind remodeling of 1 bathroom(s) in 2nd fl with 0 shower pan(s).Details
in-kind remodeling of 1 kitchen(s) in 2nd fl and in-kind remodeling of 1 bathroom(s) in 2nd fl with 0 shower pan(s). | $65,000 |
| Jan 3, 2026 | In progress issued Sep 2026 | 2306 30th Av | 1/f: add 2 bedroom, 1 full bath, family, office & laundry. 2/f: remodel kitchen & bathroom. relocate 2 bedrooms. replace all windows in-kind w/ vinyl. rear addition.Details
1/f: add 2 bedroom, 1 full bath, family, office & laundry. 2/f: remodel kitchen & bathroom. relocate 2 bedrooms. replace all windows in-kind w/ vinyl. rear addition. | $280,000 |
| Oct 9, 2025 | In progress issued Dec 2025 | 2259 27th Av | 1st floor: relocate laundry, add family room with wet bar, mudroom, playroom, 1 bedroom and bathroom. 2nd floor: reconfigure kitchen and dining, remodel existing bedrooms & bathroom, add 1 office & bathroom. remove existing rear shed, infill light-well, & new patio at rear.Details
1st floor: relocate laundry, add family room with wet bar, mudroom, playroom, 1 bedroom and bathroom. 2nd floor: reconfigure kitchen and dining, remodel existing bedrooms & bathroom, add 1 office & bathroom. remove existing rear shed, infill light-well, & new patio at rear. | $220,000 |
| Jun 4, 2025 | Completed final sign-off Oct 2025 | 726 Junipero Serra Bl | interior bath remodel within (e) building. no changes to building footprint or exterior. associated plumbing and electrical workDetails
interior bath remodel within (e) building. no changes to building footprint or exterior. associated plumbing and electrical work | $20,552 |
| Mar 18, 2025 | Completed final sign-off Feb 2026 | 531 Bowdoin St | 2nd fl. remodel -relocated kitchen, family room and one bath 1st fl. legalizing one full bath, one office and one media room, remove illegal sun roomDetails
2nd fl. remodel -relocated kitchen, family room and one bath 1st fl. legalizing one full bath, one office and one media room, remove illegal sun room | $60,000 |
| May 24, 2024 | Completed final sign-off Nov 2024 | 184 Locksley Av | unit #5: remodel a kitchen. remodel a bathroom. add 20 lights.Details
unit #5: remodel a kitchen. remodel a bathroom. add 20 lights. | $50,000 |
| Oct 27, 2023 | Completed final sign-off Mar 2024 | 5173 Diamond Heights Bl | remodel (1) bathroom in kindDetails
remodel (1) bathroom in kind | $12,000 |
| Oct 26, 2022 | Completed final sign-off Oct 2023 | 68 Morningside Dr | remodel the bathroom: change tub to standing shower, replace tiles, replace sink, replace, cabinets, and add one light. no moving wallls. no changing layout.Details
remodel the bathroom: change tub to standing shower, replace tiles, replace sink, replace, cabinets, and add one light. no moving wallls. no changing layout. | $11,000 |
| Jun 23, 2022 | Completed final sign-off Sep 2022 | 2134 36th Av | remodel one kitchen and two bathrooms.Details
remodel one kitchen and two bathrooms. | $25,000 |
| Aug 2, 2021 | Completed final sign-off Jun 2022 | 2731 Golden Gate Av | remodel two existing bathroom in kind without any changes to square footage or structural work. lights per cec 150.0 (k)Details
remodel two existing bathroom in kind without any changes to square footage or structural work. lights per cec 150.0 (k) | $20,000 |
| Jan 29, 2021 | Completed final sign-off Apr 2022 | 471 40th Av | rev pa201912189868-on 2/f side exention of 39sf to be filled in (e) nonshared lightwell for a new kitchen,remodel (e) bathroom and add a full bathroo, add 3 skylights. no work in the front.Details
rev pa201912189868-on 2/f side exention of 39sf to be filled in (e) nonshared lightwell for a new kitchen,remodel (e) bathroom and add a full bathroo, add 3 skylights. no work in the front. | $100,000 |