Back to bathroom remodel contractors
Balla Construction And Design
- Based in
- San Francisco
- On San Francisco permits
- Aug 2008 to Apr 2021
- Last 24 months
- 0 permits filed
82 permits since 2000: 72 completed, 6 never finaled, 4 expired or cancelled.
Of the 6 never-finaled permits, 5 are 5 to 10 years old, 1 is over 10 years old. 1 was filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
30 bathroom remodel permits: 26 completed, 3 never finaled, 1 expired or cancelled. Typically 0 days from filing to permit and 162 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 12, 2020 | Completed final sign-off Nov 2020 | 2650 Irving St | apts 1 & 4: each apt: replace ktichen (8x11ft) cabinets in-kind; replacing tile, vanity & toilet in bathroom (8x6.5ft), replacing k&t electrical wiring. all layouts remain unchanged. no walls infilled or modified.Details
apts 1 & 4: each apt: replace ktichen (8x11ft) cabinets in-kind; replacing tile, vanity & toilet in bathroom (8x6.5ft), replacing k&t electrical wiring. all layouts remain unchanged. no walls infilled or modified. | $32,500 |
| Nov 26, 2019 | Completed final sign-off Jan 2021 | 95 Cerritos Av | rev to pa# 201803022768; reconfigure/remodel 3rd fl. bathroom, add laundry closet and bedroom closet, remove washer/dryer from 1st fl. remove laundry chute from all 3 levels, reconfigure 2nd fl. hallway and 3rd fl. closets, enlare attic access, replace attic skylightDetails
rev to pa# 201803022768; reconfigure/remodel 3rd fl. bathroom, add laundry closet and bedroom closet, remove washer/dryer from 1st fl. remove laundry chute from all 3 levels, reconfigure 2nd fl. hallway and 3rd fl. closets, enlare attic access, replace attic skylight | $15,000 |
| Aug 13, 2019 | Completed final sign-off Jan 2021 | 95 Cerritos Av | revision to pa 2018-0302-2768 replace bathroom window on 2nd floor; replace windows on 3rd fl, no change in window sizesDetails
revision to pa 2018-0302-2768 replace bathroom window on 2nd floor; replace windows on 3rd fl, no change in window sizes | $5,000 |
| Mar 2, 2018 | Never finaled issued Jun 2019, no final | 95 Cerritos Av | voluntary seimsic upgrade. garage, storage & kitchen renovation. replace garage doors. replace 3 sets of windows w/n the same openings. all windows to be framed with true divides (if applicable) & bathroom remodel.Details
voluntary seimsic upgrade. garage, storage & kitchen renovation. replace garage doors. replace 3 sets of windows w/n the same openings. all windows to be framed with true divides (if applicable) & bathroom remodel. | $100,000 |
| Oct 25, 2016 | Never finaled issued Oct 2016, no final | 750 Van Ness Av | work in unit 1305: kitchen and bathroom remodel, replacing cabinets and countertop, vanity, tiles and fixtures. no new wall & no existing wall relocation. lighting shall comply with cec 150.0(k)3 & (k)5. all new fixtures shall remain at same location & comply with cbc chapter 11a for accessibility.Details
work in unit 1305: kitchen and bathroom remodel, replacing cabinets and countertop, vanity, tiles and fixtures. no new wall & no existing wall relocation. lighting shall comply with cec 150.0(k)3 & (k)5. all new fixtures shall remain at same location & comply with cbc chapter 11a for accessibility. | $21,000 |
| Jun 27, 2016 | Completed final sign-off Sep 2016 | 3940 Alemany Bl | bathroom remodeling with no structural work, replacing fixtures , electrical update.Details
bathroom remodeling with no structural work, replacing fixtures , electrical update. | $20,500 |
| Jun 13, 2016 | Completed final sign-off Sep 2016 | 2300 Cecilia Av | bathroom remodel as-is: no structural work. updaating electrical, plumbing, installing fan. shower and fan, no change on walls.Details
bathroom remodel as-is: no structural work. updaating electrical, plumbing, installing fan. shower and fan, no change on walls. | $23,000 |
| Feb 1, 2016 | Completed final sign-off Apr 2016 | 601 Lawton St | replace kitchen cabinets, plumbing fixtures, update elec. ; install fan in bathroom, update elec. replace toilet & plumbingDetails
replace kitchen cabinets, plumbing fixtures, update elec. ; install fan in bathroom, update elec. replace toilet & plumbing | $25,000 |
| Dec 16, 2015 | Completed final sign-off Dec 2019 | 557 04th Av | rear 1st floor addition. convert (e) basement to living space. create 1 bedroom & 1 bathroom.Details
rear 1st floor addition. convert (e) basement to living space. create 1 bedroom & 1 bathroom. | $75,000 |
| Aug 17, 2015 | Never finaled issued Aug 2015, no final | 459 Geary St | all work in 1 unit (ref permit 201206082224 completed) - install kitchen and wetbar cabinets with plumbing and electrical finishes (kitchen on 6/f , wet bar on 7/f); install bathroom finishes (vanities, fixtures) on 6/f and 7/f (4 bathrooms); no new walls.Details
all work in 1 unit (ref permit 201206082224 completed) - install kitchen and wetbar cabinets with plumbing and electrical finishes (kitchen on 6/f , wet bar on 7/f); install bathroom finishes (vanities, fixtures) on 6/f and 7/f (4 bathrooms); no new walls. | $50,000 |
| Jun 8, 2015 | Completed final sign-off Apr 2016 | 939 Grove St | kitchen & bathroom remodeling, replace kitchen as is: cabinets flooring & windows. adding current shower space to closet @ bathroom, enlarging closet door.Details
kitchen & bathroom remodeling, replace kitchen as is: cabinets flooring & windows. adding current shower space to closet @ bathroom, enlarging closet door. | $34,500 |
| Mar 4, 2015 | Completed final sign-off Sep 2016 | 566 Congo St | comply with 201525711, no change to exterior envelope, remodel bathrooms, upgrade structural where interior walls removed, remodel kitchen, new finishes and fixtures in kitchen and 2 baths.Details
comply with 201525711, no change to exterior envelope, remodel bathrooms, upgrade structural where interior walls removed, remodel kitchen, new finishes and fixtures in kitchen and 2 baths. | $15,000 |
| Dec 3, 2014 | Completed final sign-off Feb 2015 | 1605 12th Av | bathroom remodeling (as is): new tub, vanity, flooring, electrical. widening bedroom closet non-structural wall, doors from 24" to 48" bifold doors (2). removing ceiling sheetrock and installing sound barrier insulation, resilient channel (entire unit).Details
bathroom remodeling (as is): new tub, vanity, flooring, electrical. widening bedroom closet non-structural wall, doors from 24" to 48" bifold doors (2). removing ceiling sheetrock and installing sound barrier insulation, resilient channel (entire unit). | $20,000 |
| Sep 5, 2014 | Completed final sign-off Jun 2015 | 1127 Irving St | add two half bathrooms on the ground floor, replace (e) lights in garage.Details
add two half bathrooms on the ground floor, replace (e) lights in garage. | $20,000 |
| Sep 4, 2014 | Completed final sign-off Oct 2016 | 1234 Cole St | remodel first floor unit #1234 only including kitchen & bathrooms, new finishes & fixtures throughout. remove (e) wall between living & dining.Details
remodel first floor unit #1234 only including kitchen & bathrooms, new finishes & fixtures throughout. remove (e) wall between living & dining. | $41,000 |
| Apr 22, 2014 | Completed final sign-off Aug 2014 | 480 Euclid Av | kitchen remodel, new sheetrock, new cabinets, new lighting & washer/dryer. install sum tunnel in hallway replace vanity in master bathroom.Details
kitchen remodel, new sheetrock, new cabinets, new lighting & washer/dryer. install sum tunnel in hallway replace vanity in master bathroom. | $27,075 |
| Jun 13, 2013 | Completed final sign-off Oct 2013 | 1726 12th Av | converting one full bathroom and watercloset into one bathroom. adding lightwell space to bathroom on 2nd floor. eliminating door for water closet, relocating plumbing fixtures. install 2 skylights.Details
converting one full bathroom and watercloset into one bathroom. adding lightwell space to bathroom on 2nd floor. eliminating door for water closet, relocating plumbing fixtures. install 2 skylights. | $35,000 |
| May 17, 2013 | Completed final sign-off Jul 2013 | 2763 37th Av | remodeling small hallway bathroom & replacing tile in shower, shower pan, toilet & sink. as is no structural workDetails
remodeling small hallway bathroom & replacing tile in shower, shower pan, toilet & sink. as is no structural work | $12,000 |
| Jul 23, 2012 | Completed final sign-off Sep 2012 | 655 26th Av | wall patching in kitchen, laundry room & bathroom after plumbing & electrical jobs (in both units). replacing kitchen countertops only, repiping & electrical works. not a full kitchen & bathroom remodel.Details
wall patching in kitchen, laundry room & bathroom after plumbing & electrical jobs (in both units). replacing kitchen countertops only, repiping & electrical works. not a full kitchen & bathroom remodel. | $17,500 |
| Jun 4, 2012 | Completed final sign-off Nov 2013 | 1950 Funston Av | 1)removing stucco front of house, dryrto repair, restucco. 2)remodeling bathroom of from hallway as is, no structural work. replacing extg skylight in bathroom.Details
1)removing stucco front of house, dryrto repair, restucco. 2)remodeling bathroom of from hallway as is, no structural work. replacing extg skylight in bathroom. | $21,000 |
| Mar 9, 2012 | Completed final sign-off Sep 2012 | 151 Alice B Toklas Pl | two bathrooms remodeling, drop ceiling installation, lighting update(modification)- exisiting sprinklers are not required to be relocatedDetails
two bathrooms remodeling, drop ceiling installation, lighting update(modification)- exisiting sprinklers are not required to be relocated | $35,000 |
| Dec 29, 2011 | Completed final sign-off Jun 2012 | 180 Casitas Av | remodel 2 baths and closet on 2nd floor. remodel existing bath on 1st floor in kindDetails
remodel 2 baths and closet on 2nd floor. remodel existing bath on 1st floor in kind | $38,000 |
| Oct 6, 2011 | Completed final sign-off Nov 2011 | 641 Spruce St | bathroom remodeling: replacing tub, toilet and sink. replacing window, replacing fan.Details
bathroom remodeling: replacing tub, toilet and sink. replacing window, replacing fan. | $12,000 |
| Feb 17, 2011 | Expired or cancelled cancelled Jan 2026 | 478 Euclid Av | additional work to kitchen/bath remodel on 201012217108. reconfigure garage storage.Details
additional work to kitchen/bath remodel on 201012217108. reconfigure garage storage. | $5,000 |
| Sep 3, 2010 | Completed final sign-off Mar 2011 | 174 Springfield Dr | creating 3/4 bathroom from closet on 1st flr. bathroom remodeling on 1st. flr. with closet addition. remodeling bathroom on basement level.Details
creating 3/4 bathroom from closet on 1st flr. bathroom remodeling on 1st. flr. with closet addition. remodeling bathroom on basement level. | $58,000 |
| Aug 18, 2010 | Completed final sign-off Feb 2011 | 174 Springfield Dr | installing (1) new window in garage level bathroom, replacing (9) windows and (1) door (rear yard). u-factor = 0.40. no structural workDetails
installing (1) new window in garage level bathroom, replacing (9) windows and (1) door (rear yard). u-factor = 0.40. no structural work | $14,000 |
| Nov 25, 2009 | Completed final sign-off Jun 2011 | 389 Upper Tr | remove illegal kitchen cited under nov# 200844392. remove stove & cap gas line back to source. submit as built plans for work inspected & finaled under pa# 2008/08/18/9406: remodel 2 full baths, powder room & wet bar in media room. legalize full bathroom on 1st floor.Details
remove illegal kitchen cited under nov# 200844392. remove stove & cap gas line back to source. submit as built plans for work inspected & finaled under pa# 2008/08/18/9406: remodel 2 full baths, powder room & wet bar in media room. legalize full bathroom on 1st floor. | $500 |
| Jul 22, 2009 | Completed final sign-off Oct 2009 | 3297 Folsom St | install new skylight in 2nd floor bathroom. replace/ remodel basement/first floor interior stair with new stair (structural reinforcement). revision to app#200904287198Details
install new skylight in 2nd floor bathroom. replace/ remodel basement/first floor interior stair with new stair (structural reinforcement). revision to app#200904287198 | $7,500 |
| Apr 28, 2009 | Completed final sign-off Oct 2009 | 3297 Folsom St | enlarge bathroom on 2nd floor, new closets, converting 2 bedrooms to 1Details
enlarge bathroom on 2nd floor, new closets, converting 2 bedrooms to 1 | $28,500 |
| Aug 18, 2008 | Completed final sign-off Dec 2009 | 389 Upper Tr | 2 bahtrooms remodel. 1/2 bath remodel. (1st & 2nd floor) exterior window & patio door replacement on rear & side. creating wet bar in room on 3rd level. no visable from street. replacing interior doors & entry door.Details
2 bahtrooms remodel. 1/2 bath remodel. (1st & 2nd floor) exterior window & patio door replacement on rear & side. creating wet bar in room on 3rd level. no visable from street. replacing interior doors & entry door. | $50,000 |