Back to bathroom remodel contractors
Baird Development And Construction Inc
- Based in
- San Ramon
- On San Francisco permits
- Jul 2015 to Jun 2017
- Last 24 months
- 0 permits filed
4 permits since 2000: 3 completed, 1 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
2 bathroom remodel permits: 1 completed, 1 expired or cancelled. Typically 45 days from filing to permit and 875 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Dec 28, 2016 | Completed final sign-off Jul 2019 | 1719 Alabama St | previously review under app#201212035284(withdrawn). remove pitched roof at 3rd floor level (top floor). replace with flat roof addition at 3rd floor level. add roof top deck. remodel extg 1st and 2nd story. reconfigure floor plans, add bedrooms and bathrooms.Details
previously review under app#201212035284(withdrawn). remove pitched roof at 3rd floor level (top floor). replace with flat roof addition at 3rd floor level. add roof top deck. remodel extg 1st and 2nd story. reconfigure floor plans, add bedrooms and bathrooms. | $140,000 |
| Jul 10, 2015 | Expired or cancelled expired Jan 2019 | 48 Pond St | remodel extg 2 unit bldg. relocate rear unit at 2nd floor down to 1st floor. expand units add roof deck. modify extg bathrooms and kitchens. add 2 bathrooms and 2 bedrooms.Details
remodel extg 2 unit bldg. relocate rear unit at 2nd floor down to 1st floor. expand units add roof deck. modify extg bathrooms and kitchens. add 2 bathrooms and 2 bedrooms. | $120,000 |