Back to bathroom remodel contractors
Bailey General Contracting Co Inc
- Based in
- San Francisco
- On San Francisco permits
- Oct 2008 to Jul 2026
- Last 24 months
- 10 permits filed
104 permits since 2000: 83 completed, 4 in progress, 6 never finaled, 11 expired or cancelled.
Of the 6 never-finaled permits, 5 are 5 to 10 years old, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
20 bathroom remodel permits: 15 completed, 1 in progress, 2 never finaled, 2 expired or cancelled. Typically 0 days from filing to permit and 159 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| May 8, 2026 | In progress issued May 2026 | 557 14th Av | kitchen, bathroom, powder room remodel, replace cabinetry, appliances, in same locations. no structual work. update electrical and plumbing as needed.Details
kitchen, bathroom, powder room remodel, replace cabinetry, appliances, in same locations. no structual work. update electrical and plumbing as needed. | $100,000 |
| Mar 27, 2025 | Completed final sign-off Aug 2026 | 2007 09th Av | demo (e) bath at level 2 for (n) stairs to level 3. (n) bath at level 2. vertical addition at (e) roof level (level 3).Details
demo (e) bath at level 2 for (n) stairs to level 3. (n) bath at level 2. vertical addition at (e) roof level (level 3). | $250,000 |
| Feb 22, 2023 | Expired or cancelled cancelled Jan 2026 | 4437 23rd St | interior remodel: convert 220 sf of () unconditioned space on the ground level to one conditioned bedroom and one conditioned bathroomDetails
interior remodel: convert 220 sf of () unconditioned space on the ground level to one conditioned bedroom and one conditioned bathroom | $50,000 |
| Oct 14, 2021 | Completed final sign-off Mar 2023 | 355 Oak Park Dr | (n) 230 sf deck, 2(n) windows & 2(n) doors @ rear. warren drive side of lot. 78 sf addition @ 1st level under (e) cantilever @ rear of residence. (n) bath and (n) half bath @ level 1. plumbing and electrical as reqDetails
(n) 230 sf deck, 2(n) windows & 2(n) doors @ rear. warren drive side of lot. 78 sf addition @ 1st level under (e) cantilever @ rear of residence. (n) bath and (n) half bath @ level 1. plumbing and electrical as req | $100,000 |
| Feb 25, 2021 | Expired or cancelled expired Mar 2025 | 1501 Diamond St | remodel in kind (2) lower level bathrooms. remodel in kind (1) lower wet bar. revision to pa# 202009093767.Details
remodel in kind (2) lower level bathrooms. remodel in kind (1) lower wet bar. revision to pa# 202009093767. | $100,000 |
| Nov 25, 2020 | Never finaled issued Aug 2021, no final | 2636 Green St | remodel of (e) 4 story home. exterior: replace (e) windows and doors in kind. repair (e) siding and exterior finishes. remodel (e) roof deck at 4/f. interior: in-kind kitchen remodel. in-kind remodel of half bath at 2/f. in -kind remodel of 4 bathrooms. removal of half bath at 4th fl.Details
remodel of (e) 4 story home. exterior: replace (e) windows and doors in kind. repair (e) siding and exterior finishes. remodel (e) roof deck at 4/f. interior: in-kind kitchen remodel. in-kind remodel of half bath at 2/f. in -kind remodel of 4 bathrooms. removal of half bath at 4th fl. | $50,000 |
| Sep 9, 2020 | Completed final sign-off Mar 2025 | 1501 Diamond St | main level kitchen remodel in kind. main level powder room remodel in kind. upper level bath master remodel in kind, upper level guest bath in kindDetails
main level kitchen remodel in kind. main level powder room remodel in kind. upper level bath master remodel in kind, upper level guest bath in kind | $295,000 |
| Dec 27, 2019 | Completed final sign-off Mar 2023 | 355 Oak Park Dr | residential alterations including bathroom renovation, kitchen renovation, removal of flat ceilings, adding skylights, and roof structural upgrades. legalize gr fl family room and bathroomDetails
residential alterations including bathroom renovation, kitchen renovation, removal of flat ceilings, adding skylights, and roof structural upgrades. legalize gr fl family room and bathroom | $100,000 |
| Jan 9, 2018 | Completed final sign-off Apr 2018 | 863 Haight St | unit#4 bathroom remodel. replace all fixts in-kind. no fixts will be moved.Details
unit#4 bathroom remodel. replace all fixts in-kind. no fixts will be moved. | $25,000 |
| Aug 24, 2017 | Completed final sign-off Dec 2017 | 737 06th Av | #1 - bathroom remodel - replace all fixtures in kind; no fixtures will be moved.Details
#1 - bathroom remodel - replace all fixtures in kind; no fixtures will be moved. | $25,000 |
| Nov 14, 2016 | Completed final sign-off Jun 2017 | 1034 Guerrero St | remodel two bathrooms in kind w/out moving any finish fixtures.Details
remodel two bathrooms in kind w/out moving any finish fixtures. | $70,000 |
| Sep 9, 2016 | Completed final sign-off Feb 2017 | 350 Noe St | kitchen and bathroom remodel - replace in kind without moving any fixtures to different locations. n/a maherDetails
kitchen and bathroom remodel - replace in kind without moving any fixtures to different locations. n/a maher | $30,000 |
| Jun 16, 2016 | Completed final sign-off Nov 2016 | 909 Bay St | 1)kitchen remodel with out any fixtures being moved, enlarge entry way into kitchen by removing a wall. 2) bathroom remodel in kind with out moving any fixtures.Details
1)kitchen remodel with out any fixtures being moved, enlarge entry way into kitchen by removing a wall. 2) bathroom remodel in kind with out moving any fixtures. | $80,000 |
| Sep 30, 2015 | Completed final sign-off Mar 2016 | 777 20th Av | bathroom remodel without moving any of the plumbing outlets. replace in kind. kitchen remodel without moving any of the plumibng outlets. replace in kind.Details
bathroom remodel without moving any of the plumbing outlets. replace in kind. kitchen remodel without moving any of the plumibng outlets. replace in kind. | $50,000 |
| Jul 17, 2015 | Completed final sign-off Jan 2016 | 109 Frederick St | new bathroom at 1st fl unit in existing conditioned closet space. new window at east facadeDetails
new bathroom at 1st fl unit in existing conditioned closet space. new window at east facade | $30,000 |
| Jan 23, 2015 | Never finaled issued Jan 2015, no final | 136 Carl St | single unit remodel - interior only. update kitchen/bath. all plumbing rough location to remain. update electrical, no walls to be removed. no structural work.Details
single unit remodel - interior only. update kitchen/bath. all plumbing rough location to remain. update electrical, no walls to be removed. no structural work. | $50,000 |
| Aug 8, 2014 | Completed final sign-off Nov 2014 | 73 Seacliff Av | (1) bathroom remodel: cosmetic remodel - we will be repairing vanity, shower stall, bathroom floor and not moving any (e) utilities. strictly cosmetic.Details
(1) bathroom remodel: cosmetic remodel - we will be repairing vanity, shower stall, bathroom floor and not moving any (e) utilities. strictly cosmetic. | $25,000 |
| Mar 4, 2014 | Completed final sign-off Jun 2014 | 2201 Sacramento St | remodeling 2 bathrooms, w/o changing locations of any of the plumbing, electrical & fixtures. new tile & fixtures.Details
remodeling 2 bathrooms, w/o changing locations of any of the plumbing, electrical & fixtures. new tile & fixtures. | $45,000 |
| Jul 27, 2012 | Completed final sign-off Dec 2012 | 631 O'farrell St | room #1805 only - bathroom remodel consisting of new tile, new plumbing fixtures,no change of layout, remodel in kind, kitchen remodel-new tile, new plumbing fixtures and new base cabinet and new peninsula cabinet.Details
room #1805 only - bathroom remodel consisting of new tile, new plumbing fixtures,no change of layout, remodel in kind, kitchen remodel-new tile, new plumbing fixtures and new base cabinet and new peninsula cabinet. | $40,000 |
| Apr 26, 2012 | Completed final sign-off Oct 2012 | 2201 Sacramento St | kitchen remodel without moving gas pipe but moving water pipes over approx. 1'-0" for new sink hook up. main and master bathroom remodel with new shower valves, new plumbing fixtures and new tile. toilets and drain pipes are not going to be moved. no structuralDetails
kitchen remodel without moving gas pipe but moving water pipes over approx. 1'-0" for new sink hook up. main and master bathroom remodel with new shower valves, new plumbing fixtures and new tile. toilets and drain pipes are not going to be moved. no structural | $85,000 |