Back to bathroom remodel contractors
Bachelder And Associates
- Based in
- San Anselmo
- On San Francisco permits
- Feb 2013 to Jul 2016
- Last 24 months
- 0 permits filed
9 permits since 2000: 6 completed, 2 never finaled, 1 expired or cancelled.
Of the 2 never-finaled permits, 2 are over 10 years old. 1 was filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
6 bathroom remodel permits: 4 completed, 2 never finaled. Typically 2 days from filing to permit and 452 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 19, 2016 | Completed final sign-off Apr 2018 | 101 Lombard St | unit 506w: remodel existing kitchen, remodel existing bath, relocate laundry area. see plans.Details
unit 506w: remodel existing kitchen, remodel existing bath, relocate laundry area. see plans. | $150,000 |
| Mar 3, 2016 | Never finaled filed Mar 2016, never issued | 629 Alvarado St | 3rd flr bath remodel, slight alteration to (e) roof, (n) master bath)Details
3rd flr bath remodel, slight alteration to (e) roof, (n) master bath) | $50,000 |
| Jan 5, 2016 | Completed final sign-off Apr 2017 | 629 Alvarado St | 1st floor: add bedroom, bathroom and legalize playroom, alter 2 windows rear; expand rear deck. 2nd floor - remodel kitchen, add 1/2 bath, remove sliding door, add french doors, open floor to area below; 3rd floor - add closet to master bedroom, remodel child's bedroom closet. new fau & hwhDetails
1st floor: add bedroom, bathroom and legalize playroom, alter 2 windows rear; expand rear deck. 2nd floor - remodel kitchen, add 1/2 bath, remove sliding door, add french doors, open floor to area below; 3rd floor - add closet to master bedroom, remodel child's bedroom closet. new fau & hwh | $210,000 |
| Oct 2, 2014 | Never finaled issued Oct 2014, no final | 1125 18th St | kitchen & bath remodel. no change on walls.Details
kitchen & bath remodel. no change on walls. | $40,000 |
| Dec 2, 2013 | Completed final sign-off Feb 2015 | 1201 California St | work in unit 1501: renovate 1 bathroom, all new fixtures and finishes. convert bathtub to shower. no floor plan change/no structural work.Details
work in unit 1501: renovate 1 bathroom, all new fixtures and finishes. convert bathtub to shower. no floor plan change/no structural work. | $18,000 |
| Feb 27, 2013 | Completed final sign-off Aug 2013 | 420 Mission Bay Blvd North Bl | unit 1601:remodel bathroom, separate and reconfigur extg space to create additional rooms. f/a and sprinkler under seperate permit.Details
unit 1601:remodel bathroom, separate and reconfigur extg space to create additional rooms. f/a and sprinkler under seperate permit. | $118,200 |