Back to bathroom remodel contractors
Baca Spring Builders Llc
- Based in
- San Jose
- On San Francisco permits
- Feb 2021 to Nov 2025
- Last 24 months
- 4 permits filed
5 permits since 2000: 4 completed, 1 in progress.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
3 bathroom remodel permits: 2 completed, 1 in progress. Typically 1 days from filing to permit and 195 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Oct 16, 2025 | In progress issued Jun 2026 | 1116 Diamond St | excavate 47.7 cubic yards from the lower flr to create additional 201.56 sf (n) flr area w/ finished ceiling height of 8 ft. add (1)(n) bedroom & (1) (n) bathroom in the newly excavated lower flr; remove (e) front porch staircase & reconstruct it w/ (n) side wall enclosure to cover underside of...Details
excavate 47.7 cubic yards from the lower flr to create additional 201.56 sf (n) flr area w/ finished ceiling height of 8 ft. add (1)(n) bedroom & (1) (n) bathroom in the newly excavated lower flr; remove (e) front porch staircase & reconstruct it w/ (n) side wall enclosure to cover underside of... | $45,000 |
| Apr 2, 2025 | Completed final sign-off Mar 2026 | 1116 Diamond St | interior remodel, kitchen and bath remodel. add one new half bath. window replacements 6 at the front to be wood single hung windows 1 at front wood fixedDetails
interior remodel, kitchen and bath remodel. add one new half bath. window replacements 6 at the front to be wood single hung windows 1 at front wood fixed | $70,000 |
| Feb 10, 2021 | Completed final sign-off Mar 2021 | 555 04th St | apt 917. demo wall tiles, toilet, tub and vanity. replace toilet, tub, vanity and sink. put quartz slab on the wall that around the tub. add two led recessed lights. 1 bathroom remodel, no wall movingDetails
apt 917. demo wall tiles, toilet, tub and vanity. replace toilet, tub, vanity and sink. put quartz slab on the wall that around the tub. add two led recessed lights. 1 bathroom remodel, no wall moving | $8,000 |