B T C Bob Tedrick Construction Inc
- Based in
- Livermore
- On San Francisco permits
- Aug 2022 to Aug 2026
- Last 24 months
- 3 permits filed
7 permits since 2000: 5 completed, 2 in progress.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Deck permits
3 deck permits: 3 completed. Typically 1 days from filing to permit and 94 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jan 9, 2024 | Completed final sign-off Mar 2025 | 1327 07th Av | unit #9: partial and limited elevated deck framing repairDetails
unit #9: partial and limited elevated deck framing repair | $8,500 |
| May 10, 2023 | Completed final sign-off Aug 2023 | 3 Burnett Ave North Av | unit 6: repair existing deck walking surface only, like for like and correct waterproofing. no change made to structural system. orig plan 7912459. repair do not alter orig building or seismic force resisting system or impose any additional weightDetails
unit 6: repair existing deck walking surface only, like for like and correct waterproofing. no change made to structural system. orig plan 7912459. repair do not alter orig building or seismic force resisting system or impose any additional weight | $16,000 |
| Aug 29, 2022 | Completed final sign-off Dec 2022 | 5 Burnett Ave North Av | unit 2: repair (e) deck floor finishes, like-for like, correct water proof damages, replace handrails. no structural/seismic force resisting system/additional weight changes.Details
unit 2: repair (e) deck floor finishes, like-for like, correct water proof damages, replace handrails. no structural/seismic force resisting system/additional weight changes. | $12,000 |