B R S Construction
- Based in
- San Francisco
- On San Francisco permits
- Jun 2008 to May 2026
- Last 24 months
- 6 permits filed
72 permits since 2000: 67 completed, 2 never finaled, 3 expired or cancelled.
Of the 2 never-finaled permits, 1 is 3 to 5 years old, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Deck permits
3 deck permits: 3 completed. Typically 81 days from filing to permit and 272 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 18, 2024 | Completed final sign-off Sep 2025 | 255 Crestlake Dr | demo e) rear sliding glass door, door, & window to accommodate n) sliding door at flex room, extend flex rm to interior hall, install n) door and stair to garage, demo rear deck, replce w/ n) deck at grade, demo entry stairs, replace w/ n) stairs at main entry. demo entry canopy, replace w/n) canopyDetails
demo e) rear sliding glass door, door, & window to accommodate n) sliding door at flex room, extend flex rm to interior hall, install n) door and stair to garage, demo rear deck, replce w/ n) deck at grade, demo entry stairs, replace w/ n) stairs at main entry. demo entry canopy, replace w/n) canopy | $107,000 |
| Mar 28, 2022 | Completed final sign-off Mar 2023 | 168 Jordan Av | 1) kitchen & half bath remodel. 2) remove portion or rear wall & install sliding glass foor to existing deck 3) convert pantry into breakfast nook.Details
1) kitchen & half bath remodel. 2) remove portion or rear wall & install sliding glass foor to existing deck 3) convert pantry into breakfast nook. | $33,000 |
| Mar 17, 2022 | Completed final sign-off May 2022 | 210 San Leandro Wy | exterior replace deck less than 50% deck boards w/ trax fix railing to code (build 1984) safety replace french door w/ marvin clad wood door as original south side interior fix plaster drywall walls ceiling's due water damage paint house complete replace carpet w/ engenir wood in family roomDetails
exterior replace deck less than 50% deck boards w/ trax fix railing to code (build 1984) safety replace french door w/ marvin clad wood door as original south side interior fix plaster drywall walls ceiling's due water damage paint house complete replace carpet w/ engenir wood in family room | $18,000 |