B K Construction Company
- Based in
- San Leandro
- On San Francisco permits
- Nov 2011 to Aug 2023
- Last 24 months
- 0 permits filed
4 permits since 2000: 3 completed, 1 never finaled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 10, 2023 | Completed final sign-off Jul 2026 | 631 Ofarrell St | #502: replace kitchen cabinet and appliances at the same location on fifth floor: no change in layout, no change in walls: replace toilet and vanity at the same location; no change in layout, no change in wallsDetails
#502: replace kitchen cabinet and appliances at the same location on fifth floor: no change in layout, no change in walls: replace toilet and vanity at the same location; no change in layout, no change in walls | $10,000 |
| Apr 11, 2017 | Completed final sign-off Dec 2017 | 433 Precita Av | change of use from retail to restaurant, expansion of restroom, construct of (n) counter, hand sink, prep sink, 3 compartment sink, mop sink, electrical outlet relocation, relocation of restroom sink.Details
change of use from retail to restaurant, expansion of restroom, construct of (n) counter, hand sink, prep sink, 3 compartment sink, mop sink, electrical outlet relocation, relocation of restroom sink. | $10,000 |
| Nov 30, 2011 | Never finaled issued Nov 2011, no final | 1172 Washington St | replace dry rotted outside stair handles @ side of propertyDetails
replace dry rotted outside stair handles @ side of property | $4,000 |
| Nov 17, 2011 | Completed final sign-off Dec 2011 | 592 37th Av | replace dry rotted wood sidings @back side onlyDetails
replace dry rotted wood sidings @back side only | $7,000 |