B & J General Construction
- Based in
- San Francisco
- On San Francisco permits
- Nov 2005 to Mar 2025
- Last 24 months
- 2 permits filed
9 permits since 2000: 7 completed, 2 in progress.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
3 bathroom remodel permits: 3 completed. Typically 35 days from filing to permit and 244 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 13, 2019 | Completed final sign-off Jun 2020 | 2535 38th Av | add a family room, a bedroom and a full bathroom on the 1st fl. install new foundation relocate furnace, water heater, washer and dryerDetails
add a family room, a bedroom and a full bathroom on the 1st fl. install new foundation relocate furnace, water heater, washer and dryer | $60,000 |
| Dec 14, 2017 | Completed final sign-off Sep 2018 | 733 Santiago St | at 2nd floor - remodel existing kitchen, infill east lightwell for master bathroom, new close & modify existing dining & living. n/a maher ordinanceDetails
at 2nd floor - remodel existing kitchen, infill east lightwell for master bathroom, new close & modify existing dining & living. n/a maher ordinance | $29,000 |
| Mar 12, 2010 | Completed final sign-off Jun 2012 | 1629 Irving St | lower slab at front half of (e) storage on the ground floor. install new footing, new front window, new ada 1/2 bathrooms, replace (e) water heater, (e) furnace and (e) exterior stair. upgrade disabled access requirements throughout lower office area,Details
lower slab at front half of (e) storage on the ground floor. install new footing, new front window, new ada 1/2 bathrooms, replace (e) water heater, (e) furnace and (e) exterior stair. upgrade disabled access requirements throughout lower office area, | $80,000 |