Back to bathroom remodel contractors
B & G Build Group Inc
- Based in
- South San Francisco
- On San Francisco permits
- Aug 2023 to Mar 2026
- Last 24 months
- 4 permits filed
7 permits since 2000: 4 completed, 3 in progress.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
4 bathroom remodel permits: 2 completed, 2 in progress. Typically 0 days from filing to permit and 105 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 18, 2026 | Completed final sign-off Apr 2026 | 1001 Pine St | in-kind remodeling of 1 bathroom(s) in 5th fl with 0 shower pan(s).Details
in-kind remodeling of 1 bathroom(s) in 5th fl with 0 shower pan(s). | $10,561 |
| Jun 2, 2025 | In progress filed Jun 2025, not yet issued | 611 San Jose Av | conversion of basement/ll into adu, includes addition of sq ft in rear. modify (e) half bath & closet on 2/l for full bath & remove (e) stairs from basement to main level. convert (e) deck to sunroom & add (n) deck w/ stair to rear yard.Details
conversion of basement/ll into adu, includes addition of sq ft in rear. modify (e) half bath & closet on 2/l for full bath & remove (e) stairs from basement to main level. convert (e) deck to sunroom & add (n) deck w/ stair to rear yard. | $300,000 |
| Feb 13, 2025 | Completed final sign-off Aug 2025 | 441 Green St | relocate kitchen on 2nd level. remove partition. replace furnace for top unit. new laundry both levels. replace (e) kitchen cabinet and fixtures on 3rd level. replace bathroom fixtures/finishes on both levels. new electrical fixtures per plan. no exterior work.Details
relocate kitchen on 2nd level. remove partition. replace furnace for top unit. new laundry both levels. replace (e) kitchen cabinet and fixtures on 3rd level. replace bathroom fixtures/finishes on both levels. new electrical fixtures per plan. no exterior work. | $120,000 |
| Feb 12, 2024 | In progress issued Feb 2024 | 900 Bush St | ste 521: replace like for like, all finishes for 2 full bathrooms, (1) tub, (1) shower, 1 full kitchen. no chnages to floor plans. no electrical or plumbing relocations. tile, vanity cabinets, lights, plumbing fixtures. flooring to be in replaced. replace existing flooring with new lvt/Details
ste 521: replace like for like, all finishes for 2 full bathrooms, (1) tub, (1) shower, 1 full kitchen. no chnages to floor plans. no electrical or plumbing relocations. tile, vanity cabinets, lights, plumbing fixtures. flooring to be in replaced. replace existing flooring with new lvt/ | $30,000 |