51 permits since 2000: 44 completed, 1 in progress, 5 never finaled, 1 expired or cancelled.
Of the 5 never-finaled permits, 3 are 5 to 10 years old, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
21 bathroom remodel permits: 18 completed, 1 in progress, 2 never finaled. Typically 17 days from filing to permit and 189 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 4, 2026 | In progress issued Sep 2026 | 864 Lombard St | unit a: renovating unit, replace flooring, new kitchen cabinets, sheetrock, electrical and plumbing. no tub to shower conversions. like for like remodel. new counter tops, cadinets, flooring. new bathroom, new vanity, replace toilet.Details
unit a: renovating unit, replace flooring, new kitchen cabinets, sheetrock, electrical and plumbing. no tub to shower conversions. like for like remodel. new counter tops, cadinets, flooring. new bathroom, new vanity, replace toilet. | $89,000 |
| May 15, 2025 | Completed final sign-off Aug 2025 | 858 Lombard St | 3/flr unit a: remodel kitchen adn bathroom in kind, drywall replacement at dining room and hallway.Details
3/flr unit a: remodel kitchen adn bathroom in kind, drywall replacement at dining room and hallway. | $50,000 |
| May 16, 2024 | Completed final sign-off Oct 2024 | 858 Lombard St | replace tile floor for kitchen and bath. install 6 led lights replace countertop, kitchen cabinets and a window replace a bathtub, and paint.Details
replace tile floor for kitchen and bath. install 6 led lights replace countertop, kitchen cabinets and a window replace a bathtub, and paint. | $48,000 |
| Dec 8, 2023 | Completed final sign-off Dec 2024 | 2110 33rd Av | 1st floor new bedroom, two bathrooms, family room, yoga room and laundry roomDetails
1st floor new bedroom, two bathrooms, family room, yoga room and laundry room | $100,000 |
| May 18, 2023 | Completed final sign-off Mar 2024 | 1 Dawson Pl | apt k: 3/f remodel (e) kitchen & bathroom. removal non-load bearing partition / pony walls around bathroom. maher n/a.Details
apt k: 3/f remodel (e) kitchen & bathroom. removal non-load bearing partition / pony walls around bathroom. maher n/a. | $30,000 |
| May 18, 2023 | Completed final sign-off Mar 2024 | 1 Dawson Pl | apt g: 3/f remodel (e) kitchen & bathroom. remove non-load bearing partition / pony walls around bathroom. maher n/a.Details
apt g: 3/f remodel (e) kitchen & bathroom. remove non-load bearing partition / pony walls around bathroom. maher n/a. | $30,000 |
| May 18, 2023 | Completed final sign-off Mar 2024 | 1 Dawson Pl | apt h: 2/f remodel (e) kitchen & bathroom. removal non-load bearing partition / pony walls around bathroom. maher n/a.Details
apt h: 2/f remodel (e) kitchen & bathroom. removal non-load bearing partition / pony walls around bathroom. maher n/a. | $30,000 |
| Jul 29, 2021 | Completed final sign-off Oct 2021 | 1735 20th Av | in-kind remodeling of 1 bathroom(s) in 1st fl with 1 shower pan(s).Details
in-kind remodeling of 1 bathroom(s) in 1st fl with 1 shower pan(s). | $12,000 |
| Feb 23, 2021 | Completed final sign-off Oct 2021 | 3960 20th St | bathroom addition. retile master bath.Details
bathroom addition. retile master bath. | $50,000 |
| Apr 3, 2019 | Completed final sign-off Oct 2019 | 2256 Cecilia Av | revision to 201902062252, add 2 bedrooms, 1 full bath on 1st fl, add windows on building sides 1st fl not visible from street. replace front stairway in kind. voluntary foundation improvementDetails
revision to 201902062252, add 2 bedrooms, 1 full bath on 1st fl, add windows on building sides 1st fl not visible from street. replace front stairway in kind. voluntary foundation improvement | $30,000 |
| Feb 6, 2019 | Completed final sign-off Oct 2019 | 2256 Cecilia Av | bathroom remodel at 2nd fl; excavation to lower floor slab and new slab; no exteriorl work.Details
bathroom remodel at 2nd fl; excavation to lower floor slab and new slab; no exteriorl work. | $10,000 |
| Jun 13, 2017 | Completed final sign-off May 2021 | 2900 Baker St | horizontal addition and interior renovation. 1st flr: infill 103 sf for office & guest rm. new deck. renovation of kitchen, relocate interior stairs. 2nd flr: remodel (e) bedrms & baths. 3rd flr: rebuild the (e) roof deckDetails
horizontal addition and interior renovation. 1st flr: infill 103 sf for office & guest rm. new deck. renovation of kitchen, relocate interior stairs. 2nd flr: remodel (e) bedrms & baths. 3rd flr: rebuild the (e) roof deck | $340,121 |
| Jun 7, 2016 | Completed final sign-off Oct 2017 | 1744 North Point St | revision to pa #201603081449 - new bedroom, half bathroom & living room (for unit 1744) at 1st floor. new deck at 2nd floor. replace existing roof deck at 3rd floor. n/a maher ordinanceDetails
revision to pa #201603081449 - new bedroom, half bathroom & living room (for unit 1744) at 1st floor. new deck at 2nd floor. replace existing roof deck at 3rd floor. n/a maher ordinance | $40,000 |
| Mar 8, 2016 | Completed final sign-off Oct 2017 | 1744 North Point St | 2nd floor - remodel (e) master bathroom; add new bathroom, relocate (e) kitchen to create new office room and enclose lightwell in center of bldg on 2nd floor as per plan. 3rd floor - remodel (e) bathroom and kitchen, remove walls between dining & kitchen, living room on 3rd floor per plan. repair.Details
2nd floor - remodel (e) master bathroom; add new bathroom, relocate (e) kitchen to create new office room and enclose lightwell in center of bldg on 2nd floor as per plan. 3rd floor - remodel (e) bathroom and kitchen, remove walls between dining & kitchen, living room on 3rd floor per plan. repair. | $40,000 |
| Feb 17, 2016 | Completed final sign-off Oct 2016 | 150 Kenwood Wy | new 2 bedrooms, 2 bathrooms and family room at 1st flr as per planDetails
new 2 bedrooms, 2 bathrooms and family room at 1st flr as per plan | $34,000 |
| Jan 25, 2016 | Completed final sign-off Jun 2016 | 2182 30th Av | revision under pa 2015-1204-4147 - relocate bathroom at ground floor; enlarge bathroom at 2nd floor.Details
revision under pa 2015-1204-4147 - relocate bathroom at ground floor; enlarge bathroom at 2nd floor. | $1,000 |
| Dec 4, 2015 | Completed final sign-off Jun 2016 | 2182 30th Av | 1. remodel (e) sheetrock/replace with new & r-13 insulation. remodel (e) kitchen, bath, add one new bath. re-wire electrical lightings & rebuilt interior staircase from 2nd floor down to ground floor. 2. construct two bedroom, one full bathroom & laundry area at ground floor.Details
1. remodel (e) sheetrock/replace with new & r-13 insulation. remodel (e) kitchen, bath, add one new bath. re-wire electrical lightings & rebuilt interior staircase from 2nd floor down to ground floor. 2. construct two bedroom, one full bathroom & laundry area at ground floor. | $58,000 |
| Oct 23, 2015 | Never finaled issued Oct 2015, no final | 417 07th Av | 1) replace kitchen cabinets, faucet, stove tops and hood. 2) remodel 2 bathrooms, replace a shower door, tile, vanities, towel accessory. 3)repair extg living room ceiling.Details
1) replace kitchen cabinets, faucet, stove tops and hood. 2) remodel 2 bathrooms, replace a shower door, tile, vanities, towel accessory. 3)repair extg living room ceiling. | $35,000 |
| Oct 31, 2013 | Never finaled issued Nov 2013, no final | 555 Hyde St | work in apt. #7: comply with nov 201333452. remodel kitchen and bathroom. same to same. no entry door change.Details
work in apt. #7: comply with nov 201333452. remodel kitchen and bathroom. same to same. no entry door change. | $10,000 |
| Aug 15, 2012 | Completed final sign-off Feb 2013 | 264 Moultrie St | remodel ground floor - add one bedroom, two full baths and one family room. 2nd floor - remodel one bath and one kitchen.Details
remodel ground floor - add one bedroom, two full baths and one family room. 2nd floor - remodel one bath and one kitchen. | $50,000 |
| Aug 22, 2011 | Completed final sign-off Dec 2011 | 1676 19th Av | remodel kitchen and 1 bathroom.Details
remodel kitchen and 1 bathroom. | $35,000 |