B A Morrison
- Based in
- Castro Valley
- On San Francisco permits
- Jan 2012 to Dec 2013
- Last 24 months
- 0 permits filed
2 permits since 2000: 1 completed, 1 never finaled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Dec 4, 2013 | Never finaled issued Dec 2013, no final | 2825 California St | install hvac duct work for new layout t.i. pa#2013-0329-3393. #11/cDetails
install hvac duct work for new layout t.i. pa#2013-0329-3393. #11/c | $5,900 |
| Jan 31, 2012 | Completed final sign-off Aug 2012 | 6190 03rd St | remove 9 hvac units and 1 consenser and ducts for roofer. replace 5 hvac units with new same size and new ducts, 2 condensing units. in kind replacement of existing, less weight. separate permit required to tie in these units to fa system. verify hvac shut down for smoke detetor.Details
remove 9 hvac units and 1 consenser and ducts for roofer. replace 5 hvac units with new same size and new ducts, 2 condensing units. in kind replacement of existing, less weight. separate permit required to tie in these units to fa system. verify hvac shut down for smoke detetor. | $60,000 |