Back to bathroom remodel contractors
Aztech Maintenance Llc
- Based in
- Burlingame
- On San Francisco permits
- Aug 2020 to Aug 2025
- Last 24 months
- 2 permits filed
11 permits since 2000: 7 completed, 1 in progress, 2 never finaled, 1 expired or cancelled.
Of the 2 never-finaled permits, 2 are 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
5 bathroom remodel permits: 3 completed, 2 never finaled. Typically 0 days from filing to permit and 61 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 28, 2024 | Completed final sign-off Aug 2024 | 246 02nd St | unit#1006: replace bath tub, same location, same size. replace cabinet door (faces only), in kitchen same hinges to maintain removability. install tile @ kitchen floor, existing wood floor to be removed and new tile to be flush with surrounding floor surfaces.Details
unit#1006: replace bath tub, same location, same size. replace cabinet door (faces only), in kitchen same hinges to maintain removability. install tile @ kitchen floor, existing wood floor to be removed and new tile to be flush with surrounding floor surfaces. | $10,000 |
| Jul 25, 2023 | Completed final sign-off Aug 2023 | 355 01st St | (2) bathroom remodels in-kind: tile replacement, vanity cabinet replacement, fixture replacement, bathtub replacement, shower pan (covered under separate permit). no moving walls.Details
(2) bathroom remodels in-kind: tile replacement, vanity cabinet replacement, fixture replacement, bathtub replacement, shower pan (covered under separate permit). no moving walls. | $22,000 |
| Mar 31, 2022 | Completed final sign-off Sep 2022 | 1200 California St | bathroom & kitchen remodel: bath: scope replace tile, remove tub, install shower.replace cabinet vanities/tops,new fixtures @ kitchen, replace backspach,restore original wall. no structural workDetails
bathroom & kitchen remodel: bath: scope replace tile, remove tub, install shower.replace cabinet vanities/tops,new fixtures @ kitchen, replace backspach,restore original wall. no structural work | $30,000 |
| Jan 14, 2021 | Never finaled issued Jan 2021, no final | 74 New Montgomery St | bath room remodel. shower installation replace and relocate vanity, replace fixtures, and finishes, install tile, replace light fixturesDetails
bath room remodel. shower installation replace and relocate vanity, replace fixtures, and finishes, install tile, replace light fixtures | $11,000 |
| Jan 14, 2021 | Never finaled issued Jan 2021, no final | 260 King St | bath remodel tile install flooring drywall light fixture replace barn doors, tile removalDetails
bath remodel tile install flooring drywall light fixture replace barn doors, tile removal | $12,500 |