Back to bathroom remodel contractors
Aya Homes Llc
- Based in
- San Francisco
- On San Francisco permits
- Mar 2019 to Dec 2025
- Last 24 months
- 9 permits filed
25 permits since 2000: 21 completed, 3 in progress, 1 never finaled.
Of the 1 never-finaled permit, 1 is 3 to 5 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
5 bathroom remodel permits: 5 completed. Typically 124 days from filing to permit and 117 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Dec 12, 2025 | Completed final sign-off Apr 2026 | 160 Vasquez Av | remodel (e) bathroom. no layout change or wall removal; in-kind.Details
remodel (e) bathroom. no layout change or wall removal; in-kind. | $20,000 |
| Oct 30, 2024 | Completed final sign-off Jan 2026 | 151 Beaver St | interior remodel at 151 beaver st: remodeling e) bathroom, and add 1 new bathroom & new closet in the master bedroomDetails
interior remodel at 151 beaver st: remodeling e) bathroom, and add 1 new bathroom & new closet in the master bedroom | $40,000 |
| Aug 21, 2023 | Completed final sign-off Mar 2024 | 451 Joost Av | convert basement into habitable space and add a new bedroom and bathroom, replacing existing water heater with tankless wh. (405 sf)Details
convert basement into habitable space and add a new bedroom and bathroom, replacing existing water heater with tankless wh. (405 sf) | $80,000 |
| Oct 28, 2022 | Completed final sign-off Feb 2023 | 220 Lake St | in-kind remodeling of 1 kitchen(s) in 1st fl and in-kind remodeling of 3 bathroom(s) in 1st fl, 2nd fl with 0 shower pan(s).Details
in-kind remodeling of 1 kitchen(s) in 1st fl and in-kind remodeling of 3 bathroom(s) in 1st fl, 2nd fl with 0 shower pan(s). | $43,000 |
| Mar 15, 2019 | Completed final sign-off May 2021 | 522 Mangels Av | 2/f: convert (e) room into master bath.Details
2/f: convert (e) room into master bath. | $15,000 |