Back to bathroom remodel contractors
Avila's Construction Inc
- Based in
- Novato
- On San Francisco permits
- Dec 2020 to Jul 2024
- Last 24 months
- 0 permits filed
2 permits since 2000: 2 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
1 bathroom remodel permit: 1 completed. Typically 158 days from filing to permit and 185 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Dec 4, 2020 | Completed final sign-off Nov 2021 | 1658 Union St | #100: full remodel of ground floor (vacant) apt, to include r/r of kitchen cabinets, countertops, appliances, plumbing fixtures. r/r bathroom cabinets, countertops, fixtures. reconfigure space/modify walls to enlarge bathroom. enlarge master bdrm by abandoning 2nd bdrm partition wall. upgrade elecDetails
#100: full remodel of ground floor (vacant) apt, to include r/r of kitchen cabinets, countertops, appliances, plumbing fixtures. r/r bathroom cabinets, countertops, fixtures. reconfigure space/modify walls to enlarge bathroom. enlarge master bdrm by abandoning 2nd bdrm partition wall. upgrade elec | $58,900 |