Back to bathroom remodel contractors
Associated Builders
- Based in
- San Francisco
- On San Francisco permits
- Jan 2000 to Dec 2025
- Last 24 months
- 13 permits filed
503 permits since 2000: 257 completed, 10 in progress, 115 never finaled, 121 expired or cancelled.
Of the 115 never-finaled permits, 4 are 3 to 5 years old, 12 are 5 to 10 years old, 99 are over 10 years old. 3 were filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
23 bathroom remodel permits: 18 completed, 2 in progress, 1 never finaled, 2 expired or cancelled. Typically 9 days from filing to permit and 158 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 31, 2025 | In progress issued Apr 2025 | 1426 Donner Av | ti project to build 2 storage rooms with mezzanine above, total 1,187 sq ft, with 1 remodeled ada accessible bathroom. no change of use & no exterior work.Details
ti project to build 2 storage rooms with mezzanine above, total 1,187 sq ft, with 1 remodeled ada accessible bathroom. no change of use & no exterior work. | $250,000 |
| Mar 25, 2024 | In progress issued Jan 2025 | 1751 Quesada Av | adu unit (unit 1751a) will be added per government code section 65852.2. convert existing basement into adu including adding new bedroom, bathroom, kitchen / living, (2) glass doors and casement windows at the rear of building (not visable from a street or other public right-of-way)Details
adu unit (unit 1751a) will be added per government code section 65852.2. convert existing basement into adu including adding new bedroom, bathroom, kitchen / living, (2) glass doors and casement windows at the rear of building (not visable from a street or other public right-of-way) | $95,000 |
| Jun 8, 2020 | Expired or cancelled expired Jan 2025 | 2912 Hawes St | conversion of (e) first floor to add accessory dwelling unit with (1) bath and kitchenette per ordinance no. 95-17 under bpa#2020-0608-8221. new unit - 370 sq ft studio. reference bpa#2019-0702-4993 for vertical addition.Details
conversion of (e) first floor to add accessory dwelling unit with (1) bath and kitchenette per ordinance no. 95-17 under bpa#2020-0608-8221. new unit - 370 sq ft studio. reference bpa#2019-0702-4993 for vertical addition. | $35,000 |
| Jul 2, 2019 | Completed final sign-off Jan 2025 | 2912 Hawes St | remodel of (e) house. 1 story vertical addition w/ 2 (n) bedrooms & 1 (n) bath. convertion of (e) crawl space to (n) garage & habitable space including 1 (n) bedrooms and 1 (n) bath. convert proposed office to adu at ground floor under separate bpa 2912 hawesDetails
remodel of (e) house. 1 story vertical addition w/ 2 (n) bedrooms & 1 (n) bath. convertion of (e) crawl space to (n) garage & habitable space including 1 (n) bedrooms and 1 (n) bath. convert proposed office to adu at ground floor under separate bpa 2912 hawes | $200,000 |
| Jun 19, 2019 | Completed final sign-off Jul 2020 | 807 Vienna St | remodel of (e) upper level, conversion of (e) unfinished ground level to add 1 (n) living room, 1 (n) bedroom & 2 (n) bathrooms, replace (e) windowsDetails
remodel of (e) upper level, conversion of (e) unfinished ground level to add 1 (n) living room, 1 (n) bedroom & 2 (n) bathrooms, replace (e) windows | $225,000 |
| Dec 3, 2018 | Completed final sign-off Oct 2020 | 371 27th Av | ground level: reconfigure (e) stair and grade, soft story retrofit, add full bath, wetbar, bedroom and office; 2nd fl - reconfigure (e) stair, delete full bath and add 1/2 bath and denDetails
ground level: reconfigure (e) stair and grade, soft story retrofit, add full bath, wetbar, bedroom and office; 2nd fl - reconfigure (e) stair, delete full bath and add 1/2 bath and den | $100,000 |
| Sep 29, 2017 | Never finaled issued Sep 2018, no final | 9 Gerke Al | horizontal extension @ 4th flr: remodel master bedroom & bathroom. (n) elevator to 4th flr, 3rd flr, and 1st flr. no access to 2nd flr.Details
horizontal extension @ 4th flr: remodel master bedroom & bathroom. (n) elevator to 4th flr, 3rd flr, and 1st flr. no access to 2nd flr. | $60,000 |
| Mar 30, 2017 | Completed final sign-off Jun 2017 | 921 Persia Av | bathroom remodel - replace bathroom fixtures, retile, install light & fan at 1st floorDetails
bathroom remodel - replace bathroom fixtures, retile, install light & fan at 1st floor | $15,925 |
| Jan 20, 2017 | Completed final sign-off Apr 2017 | 1099 Noe St | apt 4 -ktichen & bath remodelDetails
apt 4 -ktichen & bath remodel | $31,175 |
| Jun 21, 2016 | Expired or cancelled expired Feb 2021 | 459 42nd Av | remove existing tile & fixture & cabinet & replace in a bathroom. " no structural work".Details
remove existing tile & fixture & cabinet & replace in a bathroom. " no structural work". | $7,500 |
| Apr 15, 2016 | Completed final sign-off Dec 2017 | 1242 Alabama St | residential remodel, add 1 & new entertainment room at ground floor, interior stairs to connect 1st and 2nd floor, remodel (e) half bath at 2/f.Details
residential remodel, add 1 & new entertainment room at ground floor, interior stairs to connect 1st and 2nd floor, remodel (e) half bath at 2/f. | $67,375 |
| Feb 10, 2016 | Completed final sign-off May 2016 | 241 Stanyan St | bathroom remodel, 1 full w.c.Details
bathroom remodel, 1 full w.c. | $12,650 |
| Dec 3, 2015 | Completed final sign-off Jun 2018 | 147 Bronte St | vertical & horizontal extension. renovation & expansion of existing single family house. including additional bathrooms.Details
vertical & horizontal extension. renovation & expansion of existing single family house. including additional bathrooms. | $425,000 |
| Mar 13, 2015 | Completed final sign-off May 2015 | 1000 Franklin St | unit #13: kitchen cabinet replacement and bathroom tile workDetails
unit #13: kitchen cabinet replacement and bathroom tile work | $22,000 |
| Sep 11, 2012 | Completed final sign-off Mar 2013 | 57 Barcelona Av | remodel (e) storage area at rear of property behind ground floor garage to connect to 2nd flr unit with communicating stair. add (1) bedroom, (1) bath, family rm, laundry and reclad deck. replace (e) windows at 2nd and 3rd flr. due to age & reclad rear elevation where asbestos siding is abated.Details
remodel (e) storage area at rear of property behind ground floor garage to connect to 2nd flr unit with communicating stair. add (1) bedroom, (1) bath, family rm, laundry and reclad deck. replace (e) windows at 2nd and 3rd flr. due to age & reclad rear elevation where asbestos siding is abated. | $89,000 |
| Apr 24, 2012 | Completed final sign-off Sep 2012 | 2376 45th Av | play room remodeling on existing structure at 1st floor, non-bearing partition wall, 1 new bathroom, electrical and plumbingDetails
play room remodeling on existing structure at 1st floor, non-bearing partition wall, 1 new bathroom, electrical and plumbing | $18,000 |
| Jul 18, 2011 | Completed final sign-off Sep 2011 | 30 Pinehurst Wy | remodel 1(e) ground flr. bathroom; replace 1970's fixtures, re-tile (e) walll/floor. no structural work.Details
remodel 1(e) ground flr. bathroom; replace 1970's fixtures, re-tile (e) walll/floor. no structural work. | $11,000 |
| Sep 22, 2010 | Completed final sign-off Oct 2010 | 432 Ulloa St | revision to pa#200407088307: delete remodel of south bathroom from scope of work.Details
revision to pa#200407088307: delete remodel of south bathroom from scope of work. | |
| Feb 22, 2010 | Completed final sign-off Feb 2011 | 625 Lakeview Av | 2 story rear horizontal extension 19'x 24' for bedroom, studio & half bath & storage room. remove living room interior partition walls, relocate bath door. 2 new sound doors. replace front window in kind. new forded air heater, gas, flue. new roof drain, 1/2 bath, new elec circuits for new space.Details
2 story rear horizontal extension 19'x 24' for bedroom, studio & half bath & storage room. remove living room interior partition walls, relocate bath door. 2 new sound doors. replace front window in kind. new forded air heater, gas, flue. new roof drain, 1/2 bath, new elec circuits for new space. | $185,000 |
| Jan 27, 2009 | Completed final sign-off Nov 2009 | 2950 Lake St | reroofing,replace windows in kind, doors and new garage door. add insulation, new flooring, kitchen, baths, and laundry remodel, new partition ,new radiant heating system, new plumbing fixtures, elec panels, outlets, light fixtures, and smoke alarms. new windows will be wood, same as (e) windows.Details
reroofing,replace windows in kind, doors and new garage door. add insulation, new flooring, kitchen, baths, and laundry remodel, new partition ,new radiant heating system, new plumbing fixtures, elec panels, outlets, light fixtures, and smoke alarms. new windows will be wood, same as (e) windows. | $350,000 |
| Oct 3, 2001 | Completed final sign-off Nov 2002 | 1250 Thomas Av | repair foundation, concrete floor & required, handicape bathrooms within (e) warehouse, door swing rDetails
repair foundation, concrete floor & required, handicape bathrooms within (e) warehouse, door swing r | $5,000 |
| Jan 18, 2001 | Completed final sign-off Mar 2001 | 3660 21st St | remove existing tiles main bathroom. install new tiles.Details
remove existing tiles main bathroom. install new tiles. | $3,100 |
| May 24, 2000 | Completed final sign-off Oct 2001 | 648 Fillmore St | to renew permit appl-9719050-inter walls & two bathrooms & two & two new skylightsDetails
to renew permit appl-9719050-inter walls & two bathrooms & two & two new skylights | $25,000 |