Back to bathroom remodel contractors
Aspect Builders Llc.
- Based in
- San Rafael
- On San Francisco permits
- Nov 2004 to Jul 2026
- Last 24 months
- 3 permits filed
63 permits since 2000: 52 completed, 1 in progress, 4 never finaled, 6 expired or cancelled.
Of the 4 never-finaled permits, 4 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
12 bathroom remodel permits: 9 completed, 1 never finaled, 2 expired or cancelled. Typically 0 days from filing to permit and 127 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 1, 2023 | Completed final sign-off Nov 2024 | 1125 Rhode Island St | upgrade partial foundation & ground lvl shear walls, repair & replace sog in-kind where req'd, convert 370 sqft of unconditioned gr lvl to conditioned space to contain laundry, storage, utility closets and new bath, add new windows in lightwell, replace exterior doors at ground floor in-kind,...Details
upgrade partial foundation & ground lvl shear walls, repair & replace sog in-kind where req'd, convert 370 sqft of unconditioned gr lvl to conditioned space to contain laundry, storage, utility closets and new bath, add new windows in lightwell, replace exterior doors at ground floor in-kind,... | $95,000 |
| Apr 4, 2019 | Completed final sign-off Aug 2019 | 4321 21st St | unit 1: kitchen cabinet replacement & full bath remodel, no alteration of wall/window/doorDetails
unit 1: kitchen cabinet replacement & full bath remodel, no alteration of wall/window/door | $15,000 |
| Dec 5, 2016 | Completed final sign-off Mar 2017 | 4321 21st St | remodel kitchen and bathroom replace cabinets and fixtures at same location no structural work .all in unit #6Details
remodel kitchen and bathroom replace cabinets and fixtures at same location no structural work .all in unit #6 | $7,500 |
| Oct 27, 2016 | Completed final sign-off Jul 2017 | 475 Union St | 475a union st: remodel kitchen and bathroom. replace cabinets and fixtures at same location. no structural work. to comply with his nov complaint #201622181 and 201531992.Details
475a union st: remodel kitchen and bathroom. replace cabinets and fixtures at same location. no structural work. to comply with his nov complaint #201622181 and 201531992. | $7,500 |
| Mar 14, 2013 | Expired or cancelled expired Jan 2020 | 2567 Union St | remodel (e) bathroom on 2nd floor. no change to layout or structural work needed.Details
remodel (e) bathroom on 2nd floor. no change to layout or structural work needed. | $7,500 |
| Jan 8, 2013 | Completed final sign-off Aug 2013 | 3350 21st St | remodel (e) kitchen & bathroom on ground floorDetails
remodel (e) kitchen & bathroom on ground floor | $30,000 |
| Feb 23, 2012 | Completed final sign-off Apr 2012 | 2072 Golden Gate Av | replace (e) kitchen cabinets and countertop. replace (e) master bath vanity, tile floor and tub surround. replace closet doors at guest bedroom and office in kind. lighting to comply with cec 150 (k)Details
replace (e) kitchen cabinets and countertop. replace (e) master bath vanity, tile floor and tub surround. replace closet doors at guest bedroom and office in kind. lighting to comply with cec 150 (k) | $20,000 |
| Apr 21, 2011 | Expired or cancelled expired Oct 2013 | 300 03rd St | #509: replacement (1) kitchen cabinets / top. new tile floor. replace bath vanity, new tile at floors and shower stall. new shower pan. new door to walk-in-closet. lighting to comply cec 150(k)Details
#509: replacement (1) kitchen cabinets / top. new tile floor. replace bath vanity, new tile at floors and shower stall. new shower pan. new door to walk-in-closet. lighting to comply cec 150(k) | $20,000 |
| Feb 18, 2011 | Never finaled issued Jun 2011, no final | 2567 Union St | new roof deck with glass guardrail; new staircase for deck access; partial remodel of 3rd floor to include master bathroom & closet; new corner window at front facade.Details
new roof deck with glass guardrail; new staircase for deck access; partial remodel of 3rd floor to include master bathroom & closet; new corner window at front facade. | $40,000 |
| Jan 7, 2011 | Completed final sign-off Apr 2011 | 2537 Greenwich St | remodel existing master bath. new toilet and vanity. shower to replace e tub. new tile floor and shower surround. lighting changes must comply with cec150kDetails
remodel existing master bath. new toilet and vanity. shower to replace e tub. new tile floor and shower surround. lighting changes must comply with cec150k | $12,500 |
| Oct 8, 2010 | Completed final sign-off Dec 2010 | 112 Woodland Av | new tile at tub and floor in bath; replace bath window which is perpendicular to side property line. new kitchen cabinets; new vinyl floor; level porch floor.Details
new tile at tub and floor in bath; replace bath window which is perpendicular to side property line. new kitchen cabinets; new vinyl floor; level porch floor. | $15,000 |
| Jul 1, 2009 | Completed final sign-off Jun 2010 | 960 Anza St | remodel bathroom unit #7-no floor plan alteration, new tiles floor & wall at bath tub. new plumbing fixtures. no wall relocation, provide high efficacy lights or manual on o.s. in bathroomDetails
remodel bathroom unit #7-no floor plan alteration, new tiles floor & wall at bath tub. new plumbing fixtures. no wall relocation, provide high efficacy lights or manual on o.s. in bathroom | $12,000 |