Back to bathroom remodel contractors
Ashot Baghdiyan
- Based in
- San Francisco
- On San Francisco permits
- Jul 2013 to Feb 2026
- Last 24 months
- 1 permit filed
12 permits since 2000: 8 completed, 3 never finaled, 1 expired or cancelled.
Of the 3 never-finaled permits, 2 are 5 to 10 years old, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
6 bathroom remodel permits: 6 completed. Typically 2 days from filing to permit and 380 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Feb 25, 2026 | Completed final sign-off Sep 2026 | 3420 Fulton St | all the work in the bathrooms will be performed on existing layout. interior renovation of the 1st floor kitchen, powder room and 2 bathrooms on the 2nd floor. in the kitchen while footprint remains same appliances. will change positioning of the sink to the island.Details
all the work in the bathrooms will be performed on existing layout. interior renovation of the 1st floor kitchen, powder room and 2 bathrooms on the 2nd floor. in the kitchen while footprint remains same appliances. will change positioning of the sink to the island. | $130,000 |
| Jul 2, 2019 | Completed final sign-off Jul 2020 | 215 Panorama Dr | kitchen remodel, remove walls between kitchen and family room. bath remodelDetails
kitchen remodel, remove walls between kitchen and family room. bath remodel | $40,000 |
| Jan 24, 2019 | Completed final sign-off Feb 2020 | 498 Alabama St | revision to pa 201807205110. shifting location of cafe / coffee bar apprx 10 ft north. relocate ada entry, exit, lift and bathroomsDetails
revision to pa 201807205110. shifting location of cafe / coffee bar apprx 10 ft north. relocate ada entry, exit, lift and bathrooms | |
| Jul 20, 2018 | Completed final sign-off Feb 2020 | 498 Alabama St | tenant improvement to include coffee roastery and cafe/coffee bar associated with production coffee roastery, ada path of travel improvements, ada bathroom upgrade, improvment to existing commercial kitchen. add b occupancy to coffee factory.Details
tenant improvement to include coffee roastery and cafe/coffee bar associated with production coffee roastery, ada path of travel improvements, ada bathroom upgrade, improvment to existing commercial kitchen. add b occupancy to coffee factory. | $74,000 |
| Jul 7, 2016 | Completed final sign-off May 2018 | 135 Molimo Dr | develop basement 2 bedrooms, 1 full bath 333 sf & cantilevered balcony w/i bld ftprnt. 57 sf add new interior stairs to basement & subbasement, add stair footings, storage rm & passage to yard at subbasement non habitable add new retaining walls in subbasement & extend footing for 2 cols. excavateDetails
develop basement 2 bedrooms, 1 full bath 333 sf & cantilevered balcony w/i bld ftprnt. 57 sf add new interior stairs to basement & subbasement, add stair footings, storage rm & passage to yard at subbasement non habitable add new retaining walls in subbasement & extend footing for 2 cols. excavate | $83,234 |
| Jun 11, 2015 | Completed final sign-off Dec 2015 | 1380 Greenwich St | unit 111: bathroom remodel. demo (e) bathroom to studs. no structural changes. replace shower fixtures, toiket, faucet and vanity. install new tile and sheetrock. install/replace (e) vent fan and paint. bathroom reodel. all plumbing electrical stay at (e) locations.Details
unit 111: bathroom remodel. demo (e) bathroom to studs. no structural changes. replace shower fixtures, toiket, faucet and vanity. install new tile and sheetrock. install/replace (e) vent fan and paint. bathroom reodel. all plumbing electrical stay at (e) locations. | $12,000 |