Artistic Structures Inc.
- Based in
- Sonoma
- On San Francisco permits
- Mar 2005 to Feb 2010
- Last 24 months
- 0 permits filed
28 permits since 2000: 17 completed, 2 never finaled, 9 expired or cancelled.
Of the 2 never-finaled permits, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Deck permits
2 deck permits: 2 completed. Typically 28 days from filing to permit and 188 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 20, 2009 | Completed final sign-off Feb 2010 | 3965 Washington St | install 5/8 sheetrock in garage & storage area. move (e) power room to new area, add gas fireplace. add new master bathroom on 2nd floor, move interior walls at front bedrooms. add wood deck at back of houseDetails
install 5/8 sheetrock in garage & storage area. move (e) power room to new area, add gas fireplace. add new master bathroom on 2nd floor, move interior walls at front bedrooms. add wood deck at back of house | $95,000 |
| Oct 14, 2005 | Completed final sign-off Feb 2006 | 2710 Divisadero St | replace deck membrane and dry rot ; repaint to match existing. (less than 50 percent) at frontDetails
replace deck membrane and dry rot ; repaint to match existing. (less than 50 percent) at front | $12,500 |