Artisan Builders Corp
- Based in
- San Francisco
- On San Francisco permits
- Jan 2000 to May 2018
- Last 24 months
- 0 permits filed
56 permits since 2000: 35 completed, 7 never finaled, 14 expired or cancelled.
Of the 7 never-finaled permits, 7 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Deck permits
3 deck permits: 2 completed, 1 never finaled. Typically 13 days from filing to permit and 266 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Nov 30, 2011 | Completed final sign-off Aug 2012 | 1 Hidalgo Tr | revision to permit no. 201111088535: deck dry rot repair more than 50%. raise property line parapet wall. add skylights. install new windows and doors to deck to replace existing.Details
revision to permit no. 201111088535: deck dry rot repair more than 50%. raise property line parapet wall. add skylights. install new windows and doors to deck to replace existing. | $25,000 |
| Nov 8, 2011 | Completed final sign-off Aug 2012 | 1 Hidalgo Tr | 2nd floor deck area: dry rot repair, as required, window repair, siding repair, framing repair, deck membrance and coatingDetails
2nd floor deck area: dry rot repair, as required, window repair, siding repair, framing repair, deck membrance and coating | $8,000 |
| Apr 18, 2007 | Never finaled issued Dec 2007, no final | 454 Clipper St | new second story addition at rear of bld, widen(e) footprint of rear and seismic upgrade as req'd for second story addition, re-build and replace existing non-conforming rear deck and rear structure-seismic upgrade as req'd, interior finish remodeling.Details
new second story addition at rear of bld, widen(e) footprint of rear and seismic upgrade as req'd for second story addition, re-build and replace existing non-conforming rear deck and rear structure-seismic upgrade as req'd, interior finish remodeling. | $175,000 |