Arthur Mcnulty Construction
- Based in
- San Francisco
- On San Francisco permits
- Jan 2016 to Mar 2025
- Last 24 months
- 1 permit filed
5 permits since 2000: 3 completed, 2 in progress.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
1 bathroom remodel permit: 1 in progress. Typically 231 days from filing to permit.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 14, 2023 | In progress issued Mar 2024 | 2080 Mcallister St | comply w/nov20230792 for rear stairs to be removed. remove all lathe&plaster&sheetrock.all wall coverings on top 2 flrs.interior remodel to include kitchens,baths to all unit.convert portion of garage to habitable space connected to 1 unit.seismic upgrade per plans attached.sprinkler separate permitDetails
comply w/nov20230792 for rear stairs to be removed. remove all lathe&plaster&sheetrock.all wall coverings on top 2 flrs.interior remodel to include kitchens,baths to all unit.convert portion of garage to habitable space connected to 1 unit.seismic upgrade per plans attached.sprinkler separate permit | $480,000 |