Artcore Construction
- Based in
- San Francisco
- On San Francisco permits
- Mar 2003 to Mar 2022
- Last 24 months
- 0 permits filed
190 permits since 2000: 157 completed, 12 never finaled, 21 expired or cancelled.
Of the 12 never-finaled permits, 6 are 5 to 10 years old, 6 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Deck permits
13 deck permits: 8 completed, 3 never finaled, 2 expired or cancelled. Typically 1 days from filing to permit and 77 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Oct 25, 2019 | Never finaled issued Nov 2019, no final | 368 Day St | repair dry rot as per a3 wall schedule, remodel kitchen, repair (e) deck less than 50% in kindDetails
repair dry rot as per a3 wall schedule, remodel kitchen, repair (e) deck less than 50% in kind | $25,000 |
| Aug 29, 2019 | Expired or cancelled expired Sep 2021 | 1738 18th Av | revision to 201806040906, 201905070021. reconfigure interoir layout unit b, alter (e) deck at rear of building. new patio at rear of buildingDetails
revision to 201806040906, 201905070021. reconfigure interoir layout unit b, alter (e) deck at rear of building. new patio at rear of building | $10,000 |
| Jan 31, 2017 | Never finaled issued Jan 2017, no final | 116 Madison St | repair dry rot in-kind at garage around garage door approx 70 sq ft. repair balusters at stairs and small top deck less than 50% in-kind.Details
repair dry rot in-kind at garage around garage door approx 70 sq ft. repair balusters at stairs and small top deck less than 50% in-kind. | $2,000 |
| May 27, 2016 | Never finaled issued May 2016, no final | 1559 46th Av | replace 2 metal sliding doors with new vinyl at front set back deck. not visible streetDetails
replace 2 metal sliding doors with new vinyl at front set back deck. not visible street | $2,500 |
| Apr 12, 2016 | Completed final sign-off Sep 2016 | 420 Hazelwood Av | repair (e) deck in kind per plan,less than 50%. repair retaining wall at rear of yard, relocate (e) window & (e) door on main floor.Details
repair (e) deck in kind per plan,less than 50%. repair retaining wall at rear of yard, relocate (e) window & (e) door on main floor. | $10,000 |
| Jun 26, 2013 | Completed final sign-off Aug 2013 | 2056 Revere Av | replace dry rot at rear deck and stair.Details
replace dry rot at rear deck and stair. | $4,000 |
| Jun 25, 2013 | Completed final sign-off Nov 2013 | 1747 Palou Av | add a rear deck and stair at rear.Details
add a rear deck and stair at rear. | $2,500 |
| Aug 23, 2012 | Completed final sign-off Feb 2015 | 1133 19th St | remove detached garage @ rear yard. expand (e) deck @ rear yard. new garage under deck, add approx 50 sq. ft. enclosed space under (e) building overhang @ rear year. add new 3rd story with family room, 2 bedrooms, 1 bath & 2 decks.Details
remove detached garage @ rear yard. expand (e) deck @ rear yard. new garage under deck, add approx 50 sq. ft. enclosed space under (e) building overhang @ rear year. add new 3rd story with family room, 2 bedrooms, 1 bath & 2 decks. | $362,000 |
| Apr 4, 2012 | Completed final sign-off May 2012 | 1354 De Haro St | replace rear upper cantilever deck with like kind as per plans.Details
replace rear upper cantilever deck with like kind as per plans. | $12,000 |
| Sep 16, 2008 | Completed final sign-off Oct 2008 | 95 Cragmont Av | replace the following windows on upstairs level of house. 2 front windows, 1 bathroom windows, 2 rear bedroom window, one 5' sliding door at rear. repair dry rot around rear siding door (approx 20 sq. ft) & repair leak at rear deck.Details
replace the following windows on upstairs level of house. 2 front windows, 1 bathroom windows, 2 rear bedroom window, one 5' sliding door at rear. repair dry rot around rear siding door (approx 20 sq. ft) & repair leak at rear deck. | $8,500 |
| Sep 4, 2007 | Completed final sign-off Dec 2007 | 1000 Shrader St | open up stucco. repair dryrot as needed around front deck area. up to approx 150 sq ft. repairs will be done to maintain current design.Details
open up stucco. repair dryrot as needed around front deck area. up to approx 150 sq ft. repairs will be done to maintain current design. | $8,000 |
| Mar 14, 2007 | Completed final sign-off Apr 2007 | 1433 Page St | replace (e) 4'x7' rear deck with like kind. joist and framing will be pressure treated material trex decking. vertical 2x2 will be spaced 4" or less (redwood)Details
replace (e) 4'x7' rear deck with like kind. joist and framing will be pressure treated material trex decking. vertical 2x2 will be spaced 4" or less (redwood) | $3,000 |
| Dec 8, 2004 | Expired or cancelled expired Feb 2006 | 3794 16th St | repair for dry rot at deck, front and side of build. replace joist, handrails, posts.Details
repair for dry rot at deck, front and side of build. replace joist, handrails, posts. | $2,500 |