Back to bathroom remodel contractors
Arroyo Realty & Development Llc
- Based in
- Pasadena
- On San Francisco permits
- Aug 2017 to Mar 2022
- Last 24 months
- 0 permits filed
31 permits since 2000: 25 completed, 4 never finaled, 2 expired or cancelled.
Of the 4 never-finaled permits, 4 are 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
7 bathroom remodel permits: 7 completed. Typically 136 days from filing to permit and 993 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 3, 2021 | Completed final sign-off Jul 2022 | 67 05th St | tenant improvement for vacant restaurant-16 ft hood replacement, new handicap bathroom, non bearing walls, new counters, shelving.Details
tenant improvement for vacant restaurant-16 ft hood replacement, new handicap bathroom, non bearing walls, new counters, shelving. | $175,000 |
| Mar 22, 2021 | Completed final sign-off Oct 2024 | 615 Sansome St | change of use from vacant business to cannabis retail. demo of some partitions, finishes, & fixtures. no structural work. ada upgrades at entry & bathroom.Details
change of use from vacant business to cannabis retail. demo of some partitions, finishes, & fixtures. no structural work. ada upgrades at entry & bathroom. | $10,000 |
| Feb 19, 2021 | Completed final sign-off Aug 2024 | 620 Myra Wy | renovation of level 2 kitchen & bathroom & level 1 bathroom. all exteiror windows to be replce in-kind with an additional skylight at roof & windows at rear. no other work.Details
renovation of level 2 kitchen & bathroom & level 1 bathroom. all exteiror windows to be replce in-kind with an additional skylight at roof & windows at rear. no other work. | $60,000 |
| Dec 8, 2020 | Completed final sign-off Oct 2021 | 233 Clement St | t.i.-change of use from optometrist to cannabis retail store. ada improvement to retail bathroom & entry & removel of nonbearing partitions.Details
t.i.-change of use from optometrist to cannabis retail store. ada improvement to retail bathroom & entry & removel of nonbearing partitions. | $40,000 |
| Nov 30, 2018 | Completed final sign-off Apr 2023 | 2323 Mission St | restaurant. legalize use of outdoor rear patio in response to planning enforcement 12477_enf. increase size of rear yard to providesafe dispersal area at rear. max occupant load of 49 people permitted at rear yard. install (n) ada bathroomDetails
restaurant. legalize use of outdoor rear patio in response to planning enforcement 12477_enf. increase size of rear yard to providesafe dispersal area at rear. max occupant load of 49 people permitted at rear yard. install (n) ada bathroom | $50,000 |
| Nov 30, 2018 | Completed final sign-off Apr 2019 | 891 Post St | minor remodel of laundromat to bar. type 48 bar w/ two new bathrooms and lighting. no sturctural or exterior workDetails
minor remodel of laundromat to bar. type 48 bar w/ two new bathrooms and lighting. no sturctural or exterior work | $70,000 |
| Dec 5, 2017 | Completed final sign-off Nov 2020 | 1636 Leavenworth St | remodel existing 2 story over basement building, renovation of existing 2 kitchens, 2 baths, addition of 1 1/2 bath, maher not reqDetails
remodel existing 2 story over basement building, renovation of existing 2 kitchens, 2 baths, addition of 1 1/2 bath, maher not req | $137,000 |