Arriaga Masonry
- Based in
- El Cerrito
- On San Francisco permits
- Feb 2016 to Sep 2026
- Last 24 months
- 1 permit filed
2 permits since 2000: 1 completed, 1 in progress.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Where they worked
- Single-family 1
- Multi-family (2-family, apartments) 0
- Commercial 0
- Other or unknown 0
One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in.
Deck permits
1 deck permit: 1 in progress. Typically 41 days from filing to permit.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 2, 2026 | In progress issued Oct 2026 | 2079 28th Av | removal of 2 existing windows on 2nd level at rear of property and replace with new sliding glass doors in existing openings, new at grade deck & 2nd level deck with new spiral stairs to connect both deck levels. replacement of siding with stucco finishes at rearDetails
removal of 2 existing windows on 2nd level at rear of property and replace with new sliding glass doors in existing openings, new at grade deck & 2nd level deck with new spiral stairs to connect both deck levels. replacement of siding with stucco finishes at rear | $30,000 |