Back to bathroom remodel contractors
Arpol Inc
- Based in
- Pacifica
- On San Francisco permits
- Oct 2011 to Oct 2026
- Last 24 months
- 5 permits filed
13 permits since 2000: 9 completed, 4 in progress.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
7 bathroom remodel permits: 5 completed, 2 in progress. Typically 2 days from filing to permit and 137 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 21, 2026 | In progress issued Aug 2026 | 2831 Ortega St | revision to pa#202604169599: moving the front exterior door and enclosing interior patio into living space, front window revision, rear window revision, primary bathroom layout change, kitchen layout change, new windows in family room.Details
revision to pa#202604169599: moving the front exterior door and enclosing interior patio into living space, front window revision, rear window revision, primary bathroom layout change, kitchen layout change, new windows in family room. | $6,000 |
| Apr 16, 2026 | In progress issued May 2026 | 2831 Ortega St | interior remodel at 1st and 2nd floors, including adding one bathroom each on 1st and 2nd floors.Details
interior remodel at 1st and 2nd floors, including adding one bathroom each on 1st and 2nd floors. | $65,000 |
| Oct 2, 2024 | Completed final sign-off Dec 2024 | 660 Spruce St | bathroom remodeling including demolition of non load bearing wall, remove and replace tile, plumbing, lights, outlets, switches, shower pan and bathtub, no new plumbing fixtures.Details
bathroom remodeling including demolition of non load bearing wall, remove and replace tile, plumbing, lights, outlets, switches, shower pan and bathtub, no new plumbing fixtures. | $10,000 |
| Mar 28, 2024 | Completed final sign-off Apr 2024 | 2040 Franklin St | unit 1007-bathroom shower pan tile replacement, shower valve replacement, shower wall tile replacement.Details
unit 1007-bathroom shower pan tile replacement, shower valve replacement, shower wall tile replacement. | $8,000 |
| Nov 21, 2023 | Completed final sign-off Apr 2024 | 2125 Greenwich St | 2127 greenwich-bathroom vanity in kind, kitchen countertops in kind 2125 greenwich-kitchen countertops in kind, bathroom vanity and shower enclosureDetails
2127 greenwich-bathroom vanity in kind, kitchen countertops in kind 2125 greenwich-kitchen countertops in kind, bathroom vanity and shower enclosure | $37,000 |
| Oct 7, 2022 | Completed final sign-off Feb 2023 | 370 07th St | unit#11: remodel downstair bathroom: replacing bath tub, shower valve and trim, vanity, faucet, toilet, door slab, tiling wall around bathtub, installing electric heated floor, tiling floor, paintingDetails
unit#11: remodel downstair bathroom: replacing bath tub, shower valve and trim, vanity, faucet, toilet, door slab, tiling wall around bathtub, installing electric heated floor, tiling floor, painting | $5,000 |
| Mar 10, 2022 | Completed final sign-off Dec 2024 | 751 03rd Av | permit scope reduced: no adu. interior remodel at first floor to convert garage to habitable space. two visible windows facing 3rd avenue to be replaced from vinyl to wood. create habitable space from garage into living room, 1 bedroom, 1 bathroom.Details
permit scope reduced: no adu. interior remodel at first floor to convert garage to habitable space. two visible windows facing 3rd avenue to be replaced from vinyl to wood. create habitable space from garage into living room, 1 bedroom, 1 bathroom. | $40,000 |