Armstrong Builders
- Based in
- Hercules
- On San Francisco permits
- Jul 2010 to Dec 2010
- Last 24 months
- 0 permits filed
3 permits since 2000: 3 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Deck permits
1 deck permit: 1 completed. Typically 0 days from filing to permit and 35 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 15, 2010 | Completed final sign-off Oct 2010 | 184 Corona St | put back part of deck that was dismanteled during dry rot and stucco repair, replacing some damaged timbers during repair of stucco. deck is 40" approx above grade, install x bracing or knee bracing on perimeter posts with 2x6 brace and 5/8" boltsDetails
put back part of deck that was dismanteled during dry rot and stucco repair, replacing some damaged timbers during repair of stucco. deck is 40" approx above grade, install x bracing or knee bracing on perimeter posts with 2x6 brace and 5/8" bolts | $1,200 |