Back to bathroom remodel contractors
Argos Construction
- Based in
- South Francisco
- On San Francisco permits
- Jan 2014 to Jul 2026
- Last 24 months
- 2 permits filed
40 permits since 2000: 30 completed, 2 in progress, 5 never finaled, 3 expired or cancelled.
Of the 5 never-finaled permits, 1 is 3 to 5 years old, 1 is 5 to 10 years old, 3 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
21 bathroom remodel permits: 17 completed, 1 in progress, 1 never finaled, 2 expired or cancelled. Typically 0 days from filing to permit and 120 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 23, 2025 | In progress filed Apr 2025, not yet issued | 342 26th Av | install metal beam in the low unit. install new concrete floor and new pier. remodel existing bathroom and kitchen. replace lights in the ceiling. new sheetrock. add (n) bathroom and closet at 2nd flDetails
install metal beam in the low unit. install new concrete floor and new pier. remodel existing bathroom and kitchen. replace lights in the ceiling. new sheetrock. add (n) bathroom and closet at 2nd fl | $60,000 |
| Sep 29, 2022 | Completed final sign-off Feb 2023 | 783 24th Av | remodeling kitchen: replace cabinets and appliances. remodeling two bathrooms: replace tile, sink, lights, tub in both bathrooms. upgrade electrical panel to 200 amps.Details
remodeling kitchen: replace cabinets and appliances. remodeling two bathrooms: replace tile, sink, lights, tub in both bathrooms. upgrade electrical panel to 200 amps. | $27,500 |
| Jun 29, 2022 | Completed final sign-off Dec 2022 | 3687 Market St | interior remodel to include: add new master bathroom on 3/f. one new front window and one side window.Details
interior remodel to include: add new master bathroom on 3/f. one new front window and one side window. | $20,000 |
| Mar 11, 2021 | Completed final sign-off Nov 2021 | 1617 Church St | remodel kitchen and bath. replace all appliances, cabinets, tile, fixtures, outletsDetails
remodel kitchen and bath. replace all appliances, cabinets, tile, fixtures, outlets | $28,000 |
| Nov 17, 2020 | Completed final sign-off Feb 2022 | 780 Haight St | work to (e) residential unit on 2nd flr. renovate (e) kitchen, laundry room & bathroom in existing location. add new bathroom. reconfigure closets and access to bedrooms. no exterior work.Details
work to (e) residential unit on 2nd flr. renovate (e) kitchen, laundry room & bathroom in existing location. add new bathroom. reconfigure closets and access to bedrooms. no exterior work. | $36,000 |
| Oct 30, 2020 | Completed final sign-off May 2021 | 308 Los Palmos Dr | add 2 new rooms down and full bathroom within (e) storage ara. no independent connection to street, open connectoin to floor above . no work visible from street.Details
add 2 new rooms down and full bathroom within (e) storage ara. no independent connection to street, open connectoin to floor above . no work visible from street. | $50,000 |
| Sep 10, 2020 | Completed final sign-off May 2021 | 308 Los Palmos Dr | demo (e) tile and install new tile in the bathroo. install new vanity. bathroom remodelDetails
demo (e) tile and install new tile in the bathroo. install new vanity. bathroom remodel | $14,500 |
| Jul 22, 2019 | Completed final sign-off Sep 2020 | 682 Castro St | int remodel of (e) 2 story sfd. ground flr - remodel int wall remodel kitchen, bath. 2nd flr - add new windows new stairs, new bathroom move front door. keep (e) deck, add new deck & jacuzziDetails
int remodel of (e) 2 story sfd. ground flr - remodel int wall remodel kitchen, bath. 2nd flr - add new windows new stairs, new bathroom move front door. keep (e) deck, add new deck & jacuzzi | $100,000 |
| Apr 22, 2019 | Completed final sign-off Jul 2020 | 1776 Revere Av | 1st fl: relocate interior stairs and bedroom. remodel bathroom. rooms approved under bpa #201502057655. 2nd fl: relocate kitchen & bath. and half bath and new deck at rear. attic: addstairs and 1 dormer. add hottub at rear, less than 3' from grade.Details
1st fl: relocate interior stairs and bedroom. remodel bathroom. rooms approved under bpa #201502057655. 2nd fl: relocate kitchen & bath. and half bath and new deck at rear. attic: addstairs and 1 dormer. add hottub at rear, less than 3' from grade. | $40,000 |
| Dec 22, 2017 | Completed final sign-off Feb 2018 | 3826 22nd St | 2/f (1) bathroom remodel, relocate plumbing for sink, toilet, remove washer/dryer, provide new gas line, replace new lights on ceiling, install linoleum onn floor, install gfci.Details
2/f (1) bathroom remodel, relocate plumbing for sink, toilet, remove washer/dryer, provide new gas line, replace new lights on ceiling, install linoleum onn floor, install gfci. | $8,000 |
| Oct 16, 2017 | Completed final sign-off Dec 2017 | 130 Belvedere St | remodel 1/2 bath to full bath. non-structural, all work to include electrical, plumbing. move toilet and sinkDetails
remodel 1/2 bath to full bath. non-structural, all work to include electrical, plumbing. move toilet and sink | $18,500 |
| Oct 13, 2016 | Completed final sign-off Dec 2016 | 78 Levant St | replace tub, install new stand shower, shower valve, lights on ceiling, vanity, cement boards, surround bath, tile; in-kind; no changes to wall locations.Details
replace tub, install new stand shower, shower valve, lights on ceiling, vanity, cement boards, surround bath, tile; in-kind; no changes to wall locations. | $15,975 |
| Aug 24, 2016 | Completed final sign-off Feb 2017 | 959 Wisconsin St | install new beam in the bedroom. upgrade extg bathroom with new shower pan, lights, and fan. bldg new kitchen with new plmg, cabinets. bldg new bedroom with new lights, bldg new bathroom instead of laundry room. upgrade electrical panel with new breakers.Details
install new beam in the bedroom. upgrade extg bathroom with new shower pan, lights, and fan. bldg new kitchen with new plmg, cabinets. bldg new bedroom with new lights, bldg new bathroom instead of laundry room. upgrade electrical panel with new breakers. | $31,000 |
| Jul 7, 2016 | Never finaled issued Aug 2016, no final | 4244 25th St | unit 1 & 2 (n) elec & plbg; unit 1 -structural to open wall bet (e) kitchen & dining.widen (e) opening into bedrm. revisions to (e) ktichen & (e) restrm @ separate permit.replace (e) heating sys. unit 2 -revision to (e) partitions,remodel (e) bathrm, add (n) bath,open ceiling above stair,add skyliteDetails
unit 1 & 2 (n) elec & plbg; unit 1 -structural to open wall bet (e) kitchen & dining.widen (e) opening into bedrm. revisions to (e) ktichen & (e) restrm @ separate permit.replace (e) heating sys. unit 2 -revision to (e) partitions,remodel (e) bathrm, add (n) bath,open ceiling above stair,add skylite | $100,000 |
| May 17, 2016 | Expired or cancelled withdrawn Dec 2016 | 51 Somerset St | revision to #2016-0329-3411. remodel bathroom, remodel kitchen on top floor. rebuild stair. relocate one skylight and make wider one skylight. build bathroom, den room, laundry on 1st floor. install the outside sliding doors. build new redwood patio. replace furnace.Details
revision to #2016-0329-3411. remodel bathroom, remodel kitchen on top floor. rebuild stair. relocate one skylight and make wider one skylight. build bathroom, den room, laundry on 1st floor. install the outside sliding doors. build new redwood patio. replace furnace. | $120,000 |
| Jan 8, 2016 | Completed final sign-off Mar 2016 | 150 San Felipe Av | replace bath, shower pan, all tile, lights, floor tile, replace shower valve, install gfci. n/a ordinance #155-13Details
replace bath, shower pan, all tile, lights, floor tile, replace shower valve, install gfci. n/a ordinance #155-13 | $11,500 |
| Aug 26, 2015 | Completed final sign-off Oct 2015 | 799 La Playa | convert bathroom to stand shower room. relocate drainage, vanity in hally. install like-in hallway.Details
convert bathroom to stand shower room. relocate drainage, vanity in hally. install like-in hallway. | $12,000 |
| Jan 28, 2015 | Expired or cancelled cancelled Feb 2015 | 438 Melrose Av | revision: ground all existing outlets (4 rooms) and install 4 lights on the ceiling in dining room. provide new line from bathroom to the main panel. revision to permit ap#201412012675.Details
revision: ground all existing outlets (4 rooms) and install 4 lights on the ceiling in dining room. provide new line from bathroom to the main panel. revision to permit ap#201412012675. | $11,000 |
| Dec 1, 2014 | Completed final sign-off Mar 2015 | 438 Melrose Av | remodel one bathroom on upper level. install fan (no heat). replace vanity, toilet, flooring. any lighting change will be high efficacy. no work on (e) tub separate shower stall. no change in wall and openings.Details
remodel one bathroom on upper level. install fan (no heat). replace vanity, toilet, flooring. any lighting change will be high efficacy. no work on (e) tub separate shower stall. no change in wall and openings. | $11,000 |
| Mar 3, 2014 | Completed final sign-off May 2014 | 783 25th Av | move window 18" aside from existing location @ 3/f bathroom, cover with framing existing door and install new plywood and siding outside this opening on 2/f bathroom. not visable from the street.Details
move window 18" aside from existing location @ 3/f bathroom, cover with framing existing door and install new plywood and siding outside this opening on 2/f bathroom. not visable from the street. | $200 |
| Jan 27, 2014 | Completed final sign-off May 2014 | 783 25th Av | remodeling 2 bathrooms with insulation walls, plumbing relocate, electric lights, tile change shower to bath tub on 2nd flr, lighting shall comply with t-24Details
remodeling 2 bathrooms with insulation walls, plumbing relocate, electric lights, tile change shower to bath tub on 2nd flr, lighting shall comply with t-24 | $18,000 |