Back to bathroom remodel contractors
Arflor Construction Inc
- Based in
- Hayward
- On San Francisco permits
- Dec 2022 to Feb 2026
- Last 24 months
- 1 permit filed
6 permits since 2000: 3 completed, 3 in progress.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
3 bathroom remodel permits: 2 completed, 1 in progress. Typically 7 days from filing to permit and 436 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 13, 2024 | In progress issued Jun 2024 | 255 10th Av | remove the (e) bathrooms at the interior stair landings. new interior layout at 3rd and 4th floor; add (2) bathrooms at 3rd fl, add laundry room, add bathroom at 4th floor. add new windows at 3rd and 4th floor at rear facade. remove the (e) exterior stair and landing at 3rd and 4th floors....Details
remove the (e) bathrooms at the interior stair landings. new interior layout at 3rd and 4th floor; add (2) bathrooms at 3rd fl, add laundry room, add bathroom at 4th floor. add new windows at 3rd and 4th floor at rear facade. remove the (e) exterior stair and landing at 3rd and 4th floors.... | $125,000 |
| Dec 30, 2022 | Completed final sign-off Jul 2023 | 2055 Filbert St | bathroom remodel- convert tub into walk in shower. electrical up to code. upgrade plumbing up to code. relocate toilet.Details
bathroom remodel- convert tub into walk in shower. electrical up to code. upgrade plumbing up to code. relocate toilet. | $15,000 |
| Dec 30, 2022 | Completed final sign-off Oct 2024 | 430 Garfield St | kitchen remodel in kind - replace cabinets, countertops, and light fixtures. upgrade plumbing and electrical up to code. bathroom remodel in kind - replace tiles, shower faucet, and vanity. no structural work, no floor layout or wall layout change.Details
kitchen remodel in kind - replace cabinets, countertops, and light fixtures. upgrade plumbing and electrical up to code. bathroom remodel in kind - replace tiles, shower faucet, and vanity. no structural work, no floor layout or wall layout change. | $42,000 |