Back to bathroom remodel contractors
Architectural Construction Co
- Based in
- Richmond
- On San Francisco permits
- Aug 2008 to Sep 2015
- Last 24 months
- 0 permits filed
10 permits since 2000: 7 completed, 2 never finaled, 1 expired or cancelled.
Of the 2 never-finaled permits, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
5 bathroom remodel permits: 4 completed, 1 never finaled. Typically 0 days from filing to permit and 144 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 23, 2015 | Completed final sign-off Oct 2015 | 1370 Valencia St | bath remodel, new shower valve, new vanity, additional ceiling light, 3 pc scone lights, new tile, shower same location. office/bedroom (e) window, (e) door, additional light.Details
bath remodel, new shower valve, new vanity, additional ceiling light, 3 pc scone lights, new tile, shower same location. office/bedroom (e) window, (e) door, additional light. | $13,000 |
| Apr 30, 2010 | Completed final sign-off Jun 2010 | 1100 Dolores St | 2 bathrooms tile installation, 2 new sink, vanity light and new shower valveDetails
2 bathrooms tile installation, 2 new sink, vanity light and new shower valve | $18,000 |
| Apr 30, 2010 | Never finaled issued Apr 2010, no final | 118 Denslowe Dr | 2 bathrooms remodeling relcating tub, relocating sink, rebuild shower pan, repl 2 existing windows with new tile installation, 2 bathrooms, 2 ceiling pan installation, vanity lightDetails
2 bathrooms remodeling relcating tub, relocating sink, rebuild shower pan, repl 2 existing windows with new tile installation, 2 bathrooms, 2 ceiling pan installation, vanity light | $19,400 |
| Feb 25, 2010 | Completed final sign-off Jun 2010 | 1161 Greenwich St | revision to 200909116587, increase scope to include kitchen cabinets, new appliances, new bath tub, tile, exterior window paint, vanity, replace rear door in kind. lighting per cec 150(k).Details
revision to 200909116587, increase scope to include kitchen cabinets, new appliances, new bath tub, tile, exterior window paint, vanity, replace rear door in kind. lighting per cec 150(k). | $25,000 |
| Sep 11, 2009 | Completed final sign-off Jun 2010 | 1161 Greenwich St | stucco repair- bath tile, new plumbing fixture and new shower pan, new light fixture exterior and bath.Details
stucco repair- bath tile, new plumbing fixture and new shower pan, new light fixture exterior and bath. | $14,000 |