Aquamatic Fire Protection
- Based in
- Pittsburg
- On San Francisco permits
- Apr 2000 to Dec 2025
- Last 24 months
- 19 permits filed
527 permits since 2000: 334 completed, 7 in progress, 91 never finaled, 95 expired or cancelled.
Of the 91 never-finaled permits, 3 are 3 to 5 years old, 10 are 5 to 10 years old, 78 are over 10 years old. 1 was filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Deck permits
1 deck permit: 1 completed. Typically 85 days from filing to permit and 1041 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 10, 2014 | Completed final sign-off Oct 2017 | 36 Sanchez St | installation of fire sprinklers 3rd & 4th floor & install (4) heads @ (e) rear deck on 2nd floor.Details
installation of fire sprinklers 3rd & 4th floor & install (4) heads @ (e) rear deck on 2nd floor. | $13,200 |